SAP Exam C_S43_2022 Topic 4 Question 29 Discussion

Actual exam question for SAP's C_S43_2022 exam
Question #: 29
Topic #: 4
[All C_S43_2022 Questions]

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

Show Suggested Answer Hide Answer
Suggested Answer: A, B

To set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents, you need to do the following steps:

Assign a piece of equipment with an allocated measuring point to a task list operation. This will allow you to inspect the equipment and record the measurement readings for the measuring point during the inspection round.You can assign the equipment either manually or automatically using the object list in the task list header1.

Assign a measuring point as a production resources/tools (PRT) to a task list operation. This will allow you to inspect the measuring point and record the measurement readings for it during the inspection round.You can assign the measuring point either manually or automatically using the PRT category 0010 (Measuring Point) in the task list operation1.

You do not need to assign an inspection lot to the task list header, as this is not required for inspection rounds.Inspection lots are used for quality inspections that are triggered by events such as goods receipt, production order, or sales order2.

You do not need to assign an inspection document as a PRT to the task list operation, as this is not supported for inspection rounds.Inspection documents are used for quality inspections that are based on inspection plans and inspection characteristics2.References:PM - General maintenance task listandSet up your SAP S/4HANA system for EAM Inspection Checklistsin SAP Help Portal.


Contribute your Thoughts:

Aleshia
10 months ago
Hey, I heard they're adding a new answer option - E) Assign a unicorn to the task list. Guaranteed to spice up those boring maintenance rounds!
upvoted 0 times
...
Phillip
11 months ago
B and D, for sure. Can't have a maintenance task list without the actual equipment and the necessary paperwork. It's like trying to change a tire without the jack - not gonna happen!
upvoted 0 times
...
German
11 months ago
Hmm, I'll go with B and D. Seems like the logical way to set up a thorough maintenance task list. Don't forget the inspection documents, folks! That's the secret sauce.
upvoted 0 times
Jules
10 months ago
Irene: Agreed, inspection documents are the secret sauce for a successful task list.
upvoted 0 times
...
Alpha
10 months ago
Definitely, those steps will ensure a thorough inspection round.
upvoted 0 times
...
Irene
10 months ago
Yeah, assigning equipment with measuring points and inspection documents is key.
upvoted 0 times
...
Jamie
10 months ago
I think B and D are the way to go for setting up the maintenance task list.
upvoted 0 times
...
...
Gerald
11 months ago
I believe we also need to assign a piece of equipment with an allocated measuring point to a task list operation for accurate measurement.
upvoted 0 times
...
Melissa
11 months ago
Definitely B and D. Gotta have that equipment and those inspection documents to properly track the maintenance inspections. Easy peasy!
upvoted 0 times
...
James
11 months ago
I think B and D are the correct answers. Assigning a piece of equipment with a measuring point to the task list operation, and including an inspection document as a production resource, makes the most sense for a maintenance task list.
upvoted 0 times
Cassandra
10 months ago
It's important to have a clear process for maintenance tasks.
upvoted 0 times
...
Reiko
10 months ago
I agree, those options would simplify the recording of measurement documents.
upvoted 0 times
...
Hildred
10 months ago
Yes, assigning a piece of equipment with a measuring point and including an inspection document makes sense.
upvoted 0 times
...
Jaclyn
10 months ago
I think B and D are the correct answers.
upvoted 0 times
...
Angelo
11 months ago
Including an inspection document as a production resource is also important for maintaining accurate records.
upvoted 0 times
...
Angelo
11 months ago
I agree, assigning a piece of equipment with a measuring point is essential for the task list operation.
upvoted 0 times
...
...
Tori
11 months ago
I agree with Kerry. It's one of the correct answers to set up the maintenance task list.
upvoted 0 times
...
Kerry
11 months ago
I think we need to assign a measuring point as a PRT to a task list operation.
upvoted 0 times
...