Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

SAP C_HAMOD_2404 Exam - Topic 3 Question 22 Discussion

Posted by Ellen on Oct 22, 2024 at 04:28 AM

A cube calculation view consumes a dimension calculation view. You rename the design time file of the dimension view but do NOT choose the option to rename the runtime view and adjust the reference. Afterward, you perform the following operations:

* A: Build/deploy the dimension calculation view as a single object.

* B: Build/deploy the entire SAP HANA database module. What is the outcome of the build/deploy operations?

Suggested Answer: D

Get Premium C_HAMOD_2404 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
25 comments · newest first
EL
Eleonore 11 months ago
I thought A would still work, but guess not!
AN
Angelica 12 months ago
Yup, happened to me too.
TE
Teddy 12 months ago
Wait, are you sure about that?
NI
Nickolas 1 year ago
Totally agree, renaming messes things up!
HA
Hannah 1 year ago
A fails, B is successful.
GE
Gearldine 1 year ago
I thought we learned that building the dimension view alone would fail, but deploying the whole module could still work. So maybe A fails and B is successful?
KR
Kris 1 year ago
I have a vague recollection that if the dimension view is not properly referenced, it could lead to both A and B failing.
CA
Caitlin 1 year ago
I'm not entirely sure, but I feel like similar practice questions indicated that deploying the entire module might still succeed even if one part fails.
AL
Alison 1 year ago
I remember we discussed how renaming the design time file without updating references can cause issues. I think A will fail.
JU
Junita 1 year ago
I've seen similar issues come up before with view references. My gut instinct is that option D is the correct answer, but I'll double-check my understanding to be sure.
LA
Latanya 1 year ago
I'm not entirely sure about this one. The question is a bit ambiguous, and I could see arguments for multiple answers. I'll need to re-read it a few times and think it through carefully.
EV
Evangelina 1 year ago
Okay, let me break this down step-by-step. If I build and deploy the dimension calculation view first, and then the entire database module, I think option C is the most likely outcome.
FR
Francesco 1 year ago
Hmm, this seems like a tricky one. I'll need to carefully think through the implications of renaming the design-time file without updating the runtime view reference.
BE
Beatriz 2 years ago
I'm feeling lucky today! Let's go with C. Everything's going to fail, just like my love life.
BR
Brunilda 2 years ago
↳ replying to Beatriz
User 3: I'm not so sure about that, but let's see what happens.
TA
Tawanna 2 years ago
↳ replying to Beatriz
User 2: Yeah, let's hope for the best.
CA
Carli 2 years ago
↳ replying to Beatriz
User 1: I think C is the right choice. Everything will fail.
BA
Barbra 2 years ago
Hmm, I'm not so sure. What if the runtime view reference is actually required for the database module build to succeed? I'm going to go with B.
KE
Keith 2 years ago
I agree with Annett. The dimension calculation view needs to be deployed as a single object for A to be successful.
AR
Arlie 2 years ago
I think the correct answer is D. If the runtime view reference is not updated, the dimension calculation view build should fail, but the overall database module build should still succeed.
BO
Bobbye 2 years ago
↳ replying to Arlie
User4: A is successful.
LU
Luz 2 years ago
↳ replying to Arlie
User3: B is successful.
EM
Emmanuel 2 years ago
↳ replying to Arlie
User2: A is successful.
LU
Luis 2 years ago
↳ replying to Arlie
User1: I think the correct answer is D.
AN
Annett 2 years ago
I think the outcome will be A is successful and B fails.
0/2000 characters

Save Cancel