Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

SAP C_DBADM_2404 Exam - Topic 1 Question 39 Discussion

Posted by Iluminada on Nov 23, 2025 at 03:46 PM

Which hardware KPIs do you need to size before performing a tailored data center integration (TDI) installation for a productive SAP HANA database system? Note: There are 2 correct answers to this question.

Suggested Answer: A, B

Get Premium C_DBADM_2404 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
12 comments · newest first
OR
Oretha 10 months ago
I’m a bit confused about the persistent memory requirement. Is it really necessary for backups, or is it more about performance?
ZO
Zoila 10 months ago
I remember practicing a question about disk space for logs, so I feel like that might be one of the correct answers here.
FR
Freida 10 months ago
I think we definitely need to consider the DRAM for the static data memory area, but I'm not sure about the second one.
LE
Lera 10 months ago
I'm a bit confused on this one. I know HANA has specific hardware requirements, but I'm not 100% sure which KPIs are the most critical to size before the TDI installation. I'll have to think it through step-by-step.
SH
Shaun 10 months ago
I've got this! The correct answers are A and B - DRAM for the data memory area, and disk space for the log volume. The other options don't seem directly relevant to the question.
PU
Pura 11 months ago
I think C) is also important for backups.
HA
Harrison 11 months ago
A) and B) are definitely the right ones!
MA
Malinda 11 months ago
Alright, time to put my SAP HANA knowledge to the test. I'm pretty confident the DRAM and disk space are the two key KPIs mentioned in the question. Let me double-check my understanding before submitting.
CH
Chauncey 12 months ago
Okay, let's see. I know DRAM and disk space are important, but I'm not sure about the other options. I'll have to review my notes on SAP HANA sizing.
ST
Stephania 12 months ago
Hmm, this seems like a tricky one. I'll need to think carefully about the key hardware requirements for a SAP HANA TDI setup.
RO
Roxane 11 months ago
↳ replying to Stephania
Definitely! A is essential for memory.
JO
Joni 11 months ago
↳ replying to Stephania
I think A and B are crucial for sizing.
0/2000 characters

Save Cancel