Which hardware KPIs do you need to size before performing a tailored data center integration (TDI) installation for a productive SAP HANA database system? Note: There are 2 correct answers to this question.

Show Suggested Answer Hide Answer
Suggested Answer: A, B

Contribute your Thoughts:

0/2000 characters
Oretha
1 month ago
I’m a bit confused about the persistent memory requirement. Is it really necessary for backups, or is it more about performance?
upvoted 0 times
...
Zoila
1 month ago
I remember practicing a question about disk space for logs, so I feel like that might be one of the correct answers here.
upvoted 0 times
...
Freida
2 months ago
I think we definitely need to consider the DRAM for the static data memory area, but I'm not sure about the second one.
upvoted 0 times
...
Lera
2 months ago
I'm a bit confused on this one. I know HANA has specific hardware requirements, but I'm not 100% sure which KPIs are the most critical to size before the TDI installation. I'll have to think it through step-by-step.
upvoted 0 times
...
Shaun
2 months ago
I've got this! The correct answers are A and B - DRAM for the data memory area, and disk space for the log volume. The other options don't seem directly relevant to the question.
upvoted 0 times
...
Pura
2 months ago
I think C) is also important for backups.
upvoted 0 times
...
Harrison
3 months ago
A) and B) are definitely the right ones!
upvoted 0 times
...
Malinda
3 months ago
Alright, time to put my SAP HANA knowledge to the test. I'm pretty confident the DRAM and disk space are the two key KPIs mentioned in the question. Let me double-check my understanding before submitting.
upvoted 0 times
...
Chauncey
3 months ago
Okay, let's see. I know DRAM and disk space are important, but I'm not sure about the other options. I'll have to review my notes on SAP HANA sizing.
upvoted 0 times
...
Stephania
3 months ago
Hmm, this seems like a tricky one. I'll need to think carefully about the key hardware requirements for a SAP HANA TDI setup.
upvoted 0 times
Roxane
2 months ago
Definitely! A is essential for memory.
upvoted 0 times
...
Joni
3 months ago
I think A and B are crucial for sizing.
upvoted 0 times
...
...