Your sales team requests that datasets for their dashboards are refreshed every hour. You agree to investigate if this is possible and find that the dashboards use A datasets created from two recipes. The first recipe takes 43 min to run and the second recipe takes 25 min to run.

Is it possible to refresh data every hour?

Show Suggested Answer Hide Answer
Suggested Answer: B

Contribute your Thoughts:

Sherell
10 months ago
So, option D is the correct answer then.
upvoted 0 times
...
Dean
10 months ago
But if we run both recipes concurrently, the duration is less than an hour.
upvoted 0 times
...
Ben
10 months ago
That's true, the first recipe alone takes 43 minutes to run.
upvoted 0 times
...
Sherell
11 months ago
But the total duration of the recipe jobs is more than an hour.
upvoted 0 times
...
Arlette
11 months ago
Wait, they want to refresh the data every hour? How about we just refresh it once a day and call it a day?
upvoted 0 times
Georgeanna
10 months ago
C) No, the total duration of the recipe jobs exceeds one hour.
upvoted 0 times
...
Alesia
10 months ago
Wait, they want to refresh the data every hour? How about we just refresh it once a day and call it a day?
upvoted 0 times
...
Shala
11 months ago
A) Yes, the number of recipe runs does not exceed the limit of 60 in a 24 hour rolling period.
upvoted 0 times
...
...
Dean
11 months ago
I think it's possible to refresh data every hour.
upvoted 0 times
...
Portia
11 months ago
Concurrent recipe runs? That's just fancy talk for multi-tasking. I say go for it and see what happens!
upvoted 0 times
...
Earnestine
11 months ago
Hmm, I'm not sure if the limit is 40 or 60 in a 24-hour period. Time to brush up on my data engineering policies.
upvoted 0 times
Ciara
10 months ago
Hmm, I think we're good to refresh the data every hour then.
upvoted 0 times
...
Jerilyn
10 months ago
A) Yes, the number of recipe runs does not exceed the limit of 60 in a 24 hour rolling period.
upvoted 0 times
...
Anthony
10 months ago
Hmm, I think we're good then. The datasets can be refreshed every hour.
upvoted 0 times
...
Dwight
11 months ago
A) Yes, the number of recipe runs does not exceed the limit of 60 in a 24 hour rolling period.
upvoted 0 times
...
...
Juan
11 months ago
I agree with Reena, as long as the total duration is less than an hour, we can refresh the data every hour.
upvoted 0 times
...
Lasandra
12 months ago
C'mon, it's obvious the total duration of the recipes is more than an hour. Have they even used a calculator before?
upvoted 0 times
Sylvie
11 months ago
B) No, the number of recipe runs exceed the limit of 40 in a 24 hour rolling period.
upvoted 0 times
...
Page
11 months ago
C'mon, it's obvious the total duration of the recipes is more than an hour. Have they even used a calculator before?
upvoted 0 times
...
Lewis
11 months ago
A) Yes, the number of recipe runs does not exceed the limit of 60 in a 24 hour rolling period.
upvoted 0 times
...
...
Reena
12 months ago
I believe it's possible as long as the total duration of the recipe jobs is less than an hour.
upvoted 0 times
...
Daron
12 months ago
I think it might be difficult since the first recipe takes 43 min and the second one takes 25 min.
upvoted 0 times
...
Krystal
1 years ago
I wonder if it's possible to refresh the data every hour.
upvoted 0 times
...

Save Cancel