Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Ping Identity PT-AM-CPE Exam - Topic 3 Question 10 Discussion

Posted by Sonia on May 15, 2026 at 03:53 AM

What should be executed to ensure a successful upgrade when PingAM requires a version upgrade?

Suggested Answer: B

Upgrading PingAM 8.0.2 is a complex process that involves updating binaries, modifying schemas in the configuration store, and potentially migrating scripts to the 'Next-Generation' scripting engine. To ensure that the system is not only 'running' but also 'production-ready,' a comprehensive testing phase is required.

According to the 'Post-Upgrade Tasks' and 'Best Practices for Upgrading' documentation:

A successful upgrade verification must cover two distinct categories of testing:

Functional Tests: These verify that the core features still work as intended. Can users log in? Do the authentication trees execute correctly? Are SAML assertions being generated? This ensures the 'Logic' of the identity platform is intact.

Non-Functional Tests: These are equally critical in an upgrade scenario. An upgrade can sometimes introduce performance regressions, change the way memory is utilized by the JVM, or alter the connection pool behavior to the CTS. Testing for performance, high availability (failover), security (vulnerability scanning), and monitoring ensures the system can handle production loads and meets the organization's Service Level Agreements (SLAs).

While setting version flags (Option D) might be a technical step in some internal processes, it does not 'ensure a successful upgrade' in the way that rigorous validation does. Running only functional tests (Option A) or only non-functional tests (Option C) leaves the environment vulnerable to either logic errors or system crashes. Thus, the verified best practice is to run both functional and non-functional tests (Option B) before redirecting production traffic to the upgraded instances.


Get Premium PT-AM-CPE Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
22 comments · newest first
LE
Leonida 2 days ago
Agreed! Functional and non-functional tests cover all bases.
KI
Kindra 7 days ago
I think B is the best choice. Both tests are crucial.
FE
Fernanda 12 days ago
C doesn’t seem enough. Non-functional tests alone? No way!
TA
Tasia 17 days ago
I feel like B is the safest option. Better to be thorough.
AS
Ashlyn 23 days ago
D seems important too. Version control is key.
CA
Carin 28 days ago
I’m leaning towards A. Functional tests are a must.
TI
Timothy 1 month ago
Agreed! Functional and non-functional tests cover all bases.
CL
Clorinda 1 month ago
I think B is the best choice. Both tests are crucial.
IS
Isabelle 1 month ago
Gotta do both functional and non-functional tests for a smooth upgrade!
CH
Chanel 2 months ago
Wait, are we really sure about the need for both test types?
JE
Jeannetta 2 months ago
Isn't setting the Version Control Flag enough?
RO
Ronnie 2 months ago
I think non-functional tests are just as important.
NI
Nieves 2 months ago
Definitely need to run functional tests after the upgrade!
LO
Lorean 2 months ago
I agree, but I feel like functional tests should come first.
SH
Shenika 2 months ago
Wait, why would you skip non-functional tests? That seems risky!
BE
Ben 3 months ago
Setting the Version Control Flag is crucial too.
SH
Sherly 3 months ago
I think non-functional tests are just as important!
LI
Lisandra 3 months ago
Definitely need to run functional tests after the upgrade.
GO
Goldie 3 months ago
I feel like we focused on just running functional tests in our last session, so I'm leaning towards option A, but I might be missing something about non-functional tests.
CE
Cecilia 3 months ago
I vaguely recall that setting the Version Control Flag is crucial, but I can't remember if it should be done before or after the tests.
TA
Tandra 4 months ago
I think option B makes the most sense since it covers both functional and non-functional aspects, but I could be mixing it up with another practice question.
SH
Sharika 5 months ago
I remember we discussed the importance of running functional tests after an upgrade, but I'm not sure if we also covered non-functional tests.
0/2000 characters

Save Cancel