A consultant has deployed a new Nutanix AHV cluster with Foundation. The customer requests separating the management and production traffic in the CVM.
Which feature should the consultant configure?
A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:
* One rack with a total of 5U available
* Two ToR switches with 14 total available ports
* Dual PDUs with six available sockets
What will prevent the consultant from successfully installing the cluster?
During a six-node cluster deployment, one node fails to image successfully and Foundation is unable to automatically configure the cluster. The consultant decides to manually complete cluster formation with the successful nodes, then expand the cluster with the remaining unconfigured node.
Which command should be used to begin the process?
A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:
* Networking is set to default
* Only two NICs are connected
The customer receives the following critical message:
The NIC is disconnected from the switch, or the switchport is failing.
What should the consultant verify to resolve the issue?
What is the minimum number of nodes required for a Nutanix Cluster to support Replication Factor 3 (RF3) on a storage container?
Currently there are no comments in this discussion, be the first to comment!