Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Nutanix Exam NCS-Core Topic 3 Question 77 Discussion

Actual exam question for Nutanix's NCS-Core exam
Question #: 77
Topic #: 3
[All NCS-Core Questions]

A consultant needs to image nodes that cannot be discovered with the Foundation VM

The nodes are connected to a flat stitch and

are already part of a Nutanix cluster.

What course of action would result in Foundation success?

Show Suggested Answer Hide Answer
Suggested Answer: B

Based on the exhibit which shows an NX-3160 block with marked slots, the correct slot for installing a new node in the existing NX-3160 block is slot 2. This configuration is typically aligned with the chassis' design for orderly expansion and maintaining balanced power and cooling distribution among the nodes. Reference: Nutanix Bible, Nutanix University NCS-Core 6.8 learning materials


Contribute your Thoughts:

Stephaine
1 months ago
Wait, we're talking about imaging nodes, not baking a cake. Where's the oven and the frosting?
upvoted 0 times
...
Ailene
1 months ago
A) Use the customer's top of rack switch. Simple and straightforward, just the way I like it. No need to complicate things.
upvoted 0 times
James
13 days ago
C) Bare metal image the nodes.
upvoted 0 times
...
Quentin
16 days ago
B) Buy a new flat switch.
upvoted 0 times
...
Quentin
19 days ago
A) Use the customer's top of rack switch.
upvoted 0 times
...
...
Ozell
1 months ago
B) Buy a new flat switch? What is this, a game of Monopoly? I'm not spending any more money on this project.
upvoted 0 times
Weldon
8 days ago
D) Change the physical connections.
upvoted 0 times
...
Davida
14 days ago
B) Buy a new flat switch? What is this, a game of Monopoly? I'm not spending any more money on this project.
upvoted 0 times
...
Quinn
22 days ago
C) Bare metal image the nodes.
upvoted 0 times
...
Stephania
1 months ago
A) Use the customer's top of rack switch.
upvoted 0 times
...
...
Lenna
2 months ago
Hmm, D) Change the physical connections? I don't know, that seems a bit drastic. Why not just use the customer's existing switch?
upvoted 0 times
...
Vannessa
2 months ago
C) Bare metal image the nodes seems like the way to go. Foundation should be able to discover the nodes directly without relying on the network configuration.
upvoted 0 times
Nadine
13 days ago
C) Bare metal image the nodes.
upvoted 0 times
...
Filiberto
14 days ago
B) Buy a new flat switch.
upvoted 0 times
...
Eva
19 days ago
A) Use the customer's top of rack switch.
upvoted 0 times
...
...
Lizette
3 months ago
I would go with option C as well, it's the most logical choice.
upvoted 0 times
...
Demetra
3 months ago
I agree with Desirae, that seems like the best course of action.
upvoted 0 times
...
Desirae
3 months ago
I think we should bare metal image the nodes.
upvoted 0 times
...

Save Cancel