An administrator needs to replace an aging SAN and move to a hyper-converged infrastructure. The existing environment consists of the following hosts that are connected to the SAN:

* 5xAIX hosts

* 3x Hyper-V hosts

* 9xESXi hosts

* 2x physical SQL Clusters (Windows Server 2012R2 hosts)

After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)

Show Suggested Answer Hide Answer
Suggested Answer: A, D