Nokia 4A0-108 Exam - Topic 7 Question 59 Discussion

Actual exam question for Nokia's 4A0-108 exam
Question #: 59
Topic #: 7
[All 4A0-108 Questions]

Which of the following is NOT an advantage of using P2MP LSP as P-tunnels that instantiate PMSIs?

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

0/2000 characters
Felicitas
4 months ago
Not sure about that, C sounds off to me.
upvoted 0 times
...
Elina
4 months ago
I think traffic engineering is a huge advantage here!
upvoted 0 times
...
Beula
4 months ago
Wait, isn’t PIM still needed for some setups?
upvoted 0 times
...
Graciela
4 months ago
Totally agree, that’s a big plus!
upvoted 0 times
...
Tomas
4 months ago
P2MP LSPs can indeed improve resiliency with fast reroute.
upvoted 0 times
...
Roxanne
5 months ago
I practiced some questions on traffic engineering with P2MP LSPs, and I think that option D is definitely an advantage, so it might not be the answer we're looking for.
upvoted 0 times
...
Cristina
5 months ago
I feel like option C could be the answer since P2MP LSPs are supposed to optimize traffic to only interested receivers, but I’m not completely confident.
upvoted 0 times
...
Yen
5 months ago
I think I came across a similar question about P-tunnels and their advantages. If I recall correctly, PIM being unnecessary in the core might be a key point.
upvoted 0 times
...
Shawnda
5 months ago
I remember studying P2MP LSPs and how they can improve multicast traffic handling, but I'm not entirely sure which option is the right answer here.
upvoted 0 times
...
Billye
5 months ago
Hmm, I'm a bit unsure here. Do I need to change the default setting as well, or is that not necessary?
upvoted 0 times
...
Leota
5 months ago
I'm leaning towards D - output maps. That seems like it could be used to group attributes, but I'm not totally confident in that answer.
upvoted 0 times
...
Jonell
5 months ago
I'm a bit unsure about this one. The Network and Sharing Center seems like it could be the right place, but I'm not 100% confident. I'll have to think it through step-by-step.
upvoted 0 times
...
Beckie
5 months ago
Okay, let me walk through this step-by-step. The project scope statement and resource calendars are inputs, so that narrows it down to the planning processes. And since it's asking about the time management processes, I think the answer is Develop Schedule.
upvoted 0 times
...
Isabella
5 months ago
This question seems really confusing. I'm not sure I fully understand what it's asking.
upvoted 0 times
...