NFPA CFI-I Exam - Topic 2 Question 30 Discussion

Posted by Cory on Jul 20, 2026 at 07:52 AM

Which of the following is true regarding the copy of an issued permit?

Suggested Answer: A

Permits are required to document authorization for specific fire protection and safety activities. According to NFPA 1, Fire Code, and general permit guidelines:

Issued permits must be readily accessible at the location of the operation to ensure:

Inspectors can verify compliance with the permit requirements.

The permit holder demonstrates authorization for ongoing work.

Reissuing a permit after completion of a project (B) is not standard practice.

Permits are not the responsibility of architects (C) unless they are the permit holder.

Permits are generally non-transferable (D) because they are site-specific and operation-specific.


NFPA 1, Fire Code, Section 1.12.13: Permit requirements for accessibility and non-transferability.

Get Premium CFI-I Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
12 comments · newest first
CH
Charlene 1 month ago
But what about C? The architect should keep it, right?
CA
Carmen 1 month ago
I agree, A seems logical. We need it on-site.
MA
Marilynn 1 month ago
I think A is correct. It makes sense to have it accessible.
SH
Sharee 2 months ago
A is the only one that makes sense here.
JO
Jonelle 2 months ago
Wait, can permits really be transferred? That sounds odd.
MA
Maira 2 months ago
C seems right, but is it always the architect?
KA
Kallie 2 months ago
I thought it was B, but I guess not!
BO
Bo 2 months ago
A is definitely true, I've seen it in practice.
VI
Viva 2 months ago
I don’t think permits are transferable to a new address, so I’m leaning away from option D.
FE
Felicidad 3 months ago
I vaguely recall a question about who maintains permits, and I think it was the architect, so maybe option C is correct?
EN
Enola 3 months ago
I’m not sure about the reissuance part in option B. I feel like permits are usually tied to specific projects, but I could be wrong.
KR
Kristel 3 months ago
I think option A sounds familiar; I remember something about permits needing to be accessible on-site.