NFPA CFI-I Exam - Topic 2 Question 30 Discussion

Which of the following is true regarding the copy of an issued permit?
A) It shall be readily accessible at each place of operation.
B) It shall be reissued upon completion of the project.
C) It shall be maintained by the architect of record.
D) It shall be transferable to a new address.

NFPA CFI-I Exam - Topic 2 Question 30 Discussion

Actual exam question for NFPA's CFI-I exam
Question #: 30
Topic #: 2
[All CFI-I Questions]

Which of the following is true regarding the copy of an issued permit?

Show Suggested Answer Hide Answer
Suggested Answer: A

Permits are required to document authorization for specific fire protection and safety activities. According to NFPA 1, Fire Code, and general permit guidelines:

Issued permits must be readily accessible at the location of the operation to ensure:

Inspectors can verify compliance with the permit requirements.

The permit holder demonstrates authorization for ongoing work.

Reissuing a permit after completion of a project (B) is not standard practice.

Permits are not the responsibility of architects (C) unless they are the permit holder.

Permits are generally non-transferable (D) because they are site-specific and operation-specific.


NFPA 1, Fire Code, Section 1.12.13: Permit requirements for accessibility and non-transferability.

Contribute your Thoughts:

0/2000 characters
Sharee
1 day ago
A is the only one that makes sense here.
upvoted 0 times
...
Jonelle
6 days ago
Wait, can permits really be transferred? That sounds odd.
upvoted 0 times
...
Maira
11 days ago
C seems right, but is it always the architect?
upvoted 0 times
...
Kallie
17 days ago
I thought it was B, but I guess not!
upvoted 0 times
...
Bo
22 days ago
A is definitely true, I've seen it in practice.
upvoted 0 times
...
Viva
27 days ago
I don’t think permits are transferable to a new address, so I’m leaning away from option D.
upvoted 0 times
...
Felicidad
1 month ago
I vaguely recall a question about who maintains permits, and I think it was the architect, so maybe option C is correct?
upvoted 0 times
...
Enola
1 month ago
I’m not sure about the reissuance part in option B. I feel like permits are usually tied to specific projects, but I could be wrong.
upvoted 0 times
...
Kristel
1 month ago
I think option A sounds familiar; I remember something about permits needing to be accessible on-site.
upvoted 0 times
...