Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

NetApp NS0-527 Exam - Topic 8 Question 38 Discussion

Posted by Talia on Nov 22, 2023 at 12:46 PM

Click the Exhibit button.

A customer wants to ensure that their volumes are protected. In ONTAP System Manager, under the Protection section, you see the screen that is shown in the exhibit. The company has an asynchronous mirror policy of less than a 60-minute lag.

Referring to the exhibit, which volume has a lag that exceeds the company policy?

Suggested Answer: B

Get Premium NS0-527 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
42 comments · newest first
KA
Kate 10 months ago
Seems odd that they let it go over the limit like that.
LU
Lucille 11 months ago
No doubt, C is the one that exceeds the policy.
GR
Gracia 11 months ago
Wait, are you sure? I thought it was Volume B.
TH
Thora 11 months ago
Definitely, I noticed that too.
LI
Lindsey 11 months ago
Volume C has the highest lag, over 60 minutes.
MA
Malcolm 12 months ago
I recall that volume A had a pretty consistent lag in my studies, but I can't remember if it was over the limit. I need to double-check the exhibit again.
TR
Tracey 12 months ago
I'm not entirely sure, but I think volume C might be the one that exceeds the 60-minute lag. It just seems like it had issues in the practice scenarios.
PA
Patria 12 months ago
I practiced a similar question last week, and I remember that the lag time was clearly indicated. I need to check the exhibit closely for the exact numbers.
JA
Jamal 1 year ago
I think the lag policy is really important, but I can't remember which volume had the highest lag. I feel like it might be B or D.
RY
Ryan 1 year ago
I'm a bit unsure about this one, I'll need to double-check the information in the exhibit to make the right choice.
DE
Devorah 1 year ago
This seems straightforward, I just need to identify the volume with a lag time greater than 60 minutes.
AD
Adaline 1 year ago
Okay, let me take a close look at the exhibit and compare the lag times to the company's policy.
AL
Aleshia 1 year ago
Hmm, I need to carefully review the lag times for each volume to determine which one exceeds the 60-minute policy.
AL
Alexia 1 year ago
I think I've got it, the volume with the lag time exceeding the policy is svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_DR.
SH
Shaun 1 year ago
I'm a little confused by the wording of this question. I want to make sure I don't overthink it and miss the obvious answer. Let me re-read it carefully.
LA
Launa 1 year ago
I think we learned that you can set up event notifications, but I'm unclear if that's the same as monitoring security group changes specifically.
JE
Jenelle 1 year ago
Hmm, I'm a bit unsure about this one. The question mentions "mains and mains or mains and diesel generators," so I'm not sure if it's just asking about the automatic transfer switch or if there's more to it.
VE
Veda 1 year ago
Okay, I think I've got this. Collect the thread dump, check for third-party apps, and use the Real-Time Monitoring Tool to get the engine heap performance data and heap dumps. That should give me a good starting point to diagnose the problem.
LI
Lindy 1 year ago
The exhibit looks like a work of art. I wonder if they'll let me keep the screenshot as a souvenir if I get this right.
RE
Ressie 1 year ago
↳ replying to Lindy
D) svm_fabricpool:project_b -> svm_fabricpool:project_b_dest
EL
Elli 1 year ago
↳ replying to Lindy
C) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_DR
BR
Brandon 1 year ago
↳ replying to Lindy
B) svm_fabricpool:project_a -> svm_fabricpool:project_a_dest
LA
Lajuana 1 year ago
↳ replying to Lindy
D) svm_fabricpool:project_b -> svm_fabricpool:project_b_dest
SE
Selma 1 year ago
↳ replying to Lindy
C) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_DR
JE
Jeanice 1 year ago
↳ replying to Lindy
B) svm_fabricpool:project_a -> svm_fabricpool:project_a_dest
JA
Jame 1 year ago
↳ replying to Lindy
A) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_dest
AL
Alica 1 year ago
↳ replying to Lindy
A) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_dest
KI
Kimberely 1 year ago
Hold on, is this a trick question? What if the company's policy is actually 120 minutes and I'm overthinking this?
DU
Dustin 1 year ago
I think I'll just go with option B. After all, 'project_a' sounds more important than 'demo_volume', right?
RO
Rocco 1 year ago
↳ replying to Dustin
User 4: Option B it is then.
LO
Louann 1 year ago
↳ replying to Dustin
User 3: I agree, let's go with option B.
IV
Ivory 1 year ago
↳ replying to Dustin
User 2: Yeah, 'project_a' does sound more important.
EM
Emerson 1 year ago
↳ replying to Dustin
User 1: I think option B is the correct choice.
LO
Loreen 1 year ago
Ah, finally a question that doesn't require me to memorize the entire ONTAP manual! This one's a breeze.
CA
Cassi 1 year ago
↳ replying to Loreen
C) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_DR
MA
Marjory 1 year ago
↳ replying to Loreen
A) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_dest
KA
Katina 1 year ago
↳ replying to Loreen
C) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_DR
TE
Terry 1 year ago
↳ replying to Loreen
A) svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_dest
EM
Emilio 1 year ago
Option A seems to be the correct answer. The lag time for svm_fabricpool:demo_volume -> svm_fabricpool:demo_volume_dest exceeds the company's 60-minute policy.
ET
Ethan 2 years ago
I'm not sure, but I think it might be svm_fabricpool:project_b that exceeds the company policy.
CA
Carissa 2 years ago
I agree with Domonique, the lag for svm_fabricpool:demo_volume does seem to be more than 60 minutes.
DO
Domonique 2 years ago
I think the volume svm_fabricpool:demo_volume has a lag that exceeds the company policy.
0/2000 characters

Save Cancel