Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

MuleSoft Exam MCD-Level1-Delta Topic 1 Question 1 Discussion

Actual exam question for MuleSoft's MCD-Level1-Delta exam
Question #: 1
Topic #: 1
[All MCD-Level1-Delta Questions]

Refer to the exhibit.

In the execution of the Scatter-Gather, the "steep 1 sec" Flow Reference takes about 1 second to complete, and the "sleep 5 sees" Row Reference takes about 5 seconds to complete.

About how many seconds does it take from the time the Scatter-Gather is called until the Set Payload transformer is called?

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

Curtis
8 days ago
I agree with Darci. The Scatter-Gather runs the two references in parallel, so the overall duration is determined by the longer one, which is 5 seconds. C is the correct answer.
upvoted 0 times
...
Darci
10 days ago
Hmm, this question is quite tricky. The way I see it, the 'steep 1 sec' Flow Reference and the 'sleep 5 sees' Row Reference run concurrently in the Scatter-Gather. So, the time it takes until the Set Payload transformer is called should be the maximum of these two durations, which is 5 seconds. I'm going with option C.
upvoted 0 times
...

Save Cancel