A company uses cost groups to track calculated costs of items preassembled by vendors.
The company needs to analyze service costs for each vendor's preassembled items.
You need to assign the cost group type to the preassembled items.
Which costs should you assign?
A manufacturer uses discreet orders and manually consumes raw material after reporting products as finished.
You are performing an end-of-month closing for remaining picking lists on production orders. You must not be
required to consume the full amount of material on production order picking lists as a result of improved
production efficiency. When the production manager verifies that no material is left to consume, there are
remaining back-ordered amounts.
You need to pick the line item short and eliminate the remaining demand.
What should you do?
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of you cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.
What three actions are required on the rework order? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A company makes lubricants and greases used in the automotive industry.
They are planning to use Dynamics 365 for Finance and Operations to make products whose characteristics can be tracked throughout the production process and are associated with the packaged product.
You need to identify which production methodology to use.
Which production methodology should you use?
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Edit the existing step number two activity to be the new engineering process
2.) Edit the existing production flow. Set the expiration date due to the end of the month
3.) Edit the existing Kanban rule. Set the expiration date to the end of the month
4.) Activate the production flow
Does the solution meet the goal?
Submit Cancel