You have an SAP landscape on Azure that contains the virtual machines shown in the following table.

You need to ensure that the Application Server role is available if a single Azure datacenter fails.
What should you include in the solution?
Suggested Answer: D
Get Premium AZ-120 Questions
as Interactive Web-Based Practice Test or PDF
Real Exam Format
Detailed Explanations
Instant Access
Get Your Practice Test
13 comments · newest first
EL
Eladia
11 months ago
Wait, a local network gateway? That doesn’t sound right for this situation.
FL
Florinda
11 months ago
Azure Application Gateway v1 could also be a good option, right?
MI
Mi
11 months ago
Not so sure about that. What if the load balancer itself fails?
PE
Pete
11 months ago
Definitely agree with that! It’s designed for this kind of scenario.
EV
Evangelina
11 months ago
I think Azure Load Balancer Standard is the way to go for high availability.
FL
Fletcher
12 months ago
I’m leaning towards Azure Private Link, but I’m not confident it addresses the availability requirement directly. I might be mixing it up with something else.
CH
Christoper
12 months ago
I practiced a similar question where we had to ensure redundancy, and I feel like Azure Application Gateway was mentioned, but I can't recall if it was specifically for this type of setup.
EL
Ellen
1 year ago
I think Azure Load Balancer Standard might be the right choice since it can distribute traffic across multiple instances, but I need to double-check its failover capabilities.
CH
Cherelle
1 year ago
I remember studying about high availability options in Azure, but I'm not entirely sure which one fits best for this scenario.
GE
Gerald
1 year ago
I'm pretty confident the answer is C. Requiring an Idle Reason would force the agents to select a Reason Code when going to the "Not Ready" state, which is what the question is asking about.
VE
Vernell
1 year ago
Okay, I've got this. The question is asking about the HIPAA requirement that addresses policies and procedures for the final disposition of electronic PHI. Based on that, the answer has to be E. Disposal.
DU
Dusti
1 year ago
Hmm, I'm a bit unsure about this one. I know just-in-time is about reducing waste, but I'm not sure which of these options would be considered a value-added activity.
EL
Eladia
1 year ago
I might be mixing things up, but I feel like the output has to include all numbers from both containers, maybe in sorted order?