Which of the following is NOT a test control activity?
D) Set an entry criterion requiring fixes to be retested by a developer before accepting them into a build
A) Re-prioritize tests because of time pressure
B) Change the test schedule due to viability of a test environment
C) Writing test suspension and resumption criteria in the test plan