New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

iSQI CTFL_Syll_4.0 Exam - Topic 1 Question 6 Discussion

Actual exam question for iSQI's CTFL_Syll_4.0 exam
Question #: 6
Topic #: 1
[All CTFL_Syll_4.0 Questions]

Confirmation testing is performed after:

Show Suggested Answer Hide Answer
Suggested Answer: D

Confirmation testing is performed after a defect is fixed, and if such testing is successful then the regression tests that are relevant for such fix can be executed. Confirmation testing, also known as re-testing, is the process of verifying that a defect has been resolved by running the test case that originally detected the defect. Confirmation testing is usually done before regression testing, which is the process of verifying that no new defects have been introduced in the software as a result of changes or fixes. Therefore, option D is the correct answer.


Contribute your Thoughts:

0/2000 characters
Catarina
3 months ago
I always thought it was more about regression tests after fixes.
upvoted 0 times
...
Dominque
3 months ago
Wait, isn't confirmation testing just a fancy term for retesting?
upvoted 0 times
...
Ronny
4 months ago
I thought it was just for failed tests, but I guess I was wrong.
upvoted 0 times
...
Naomi
4 months ago
Totally agree, it's crucial to ensure no new issues pop up!
upvoted 0 times
...
Teddy
4 months ago
Confirmation testing is done after a defect fix, right?
upvoted 0 times
...
Hana
4 months ago
I’m a bit confused; I thought confirmation testing was related to reproducing a failed test, but that might be more about regression testing.
upvoted 0 times
...
Sommer
4 months ago
I feel like confirmation testing is more about verifying that the defect is no longer present, which makes me lean towards A.
upvoted 0 times
...
Gerri
4 months ago
I remember practicing a question like this, and I think it was about confirming that a fix worked, so maybe it's option A or D.
upvoted 0 times
...
Martin
5 months ago
I think confirmation testing is done after a defect is fixed, but I'm not sure if it's specifically about checking for side effects.
upvoted 0 times
...
Raul
5 months ago
Ah, this is a good one. Confirmation testing is all about verifying that a fix works as expected. I'll make sure to read the options closely and pick the one that most accurately describes the purpose of this type of testing.
upvoted 0 times
...
Dorothy
5 months ago
Okay, I think I've got this. Confirmation testing is done after a defect is fixed, to make sure the fix works and doesn't introduce any new issues. I'll select the option that best captures that.
upvoted 0 times
...
Charlie
5 months ago
This seems like a straightforward question about the purpose of confirmation testing. I'll carefully read through the options and think about the key differences between them.
upvoted 0 times
...
Teddy
5 months ago
Hmm, I'm a bit unsure about this one. The options seem similar, but I know confirmation testing is important, so I'll try to focus on the nuances between them.
upvoted 0 times
...
Camellia
5 months ago
I think I know the answer to this one. Users and groups can definitely be added as members, but the other options seem less likely. I'll go with those two.
upvoted 0 times
...
Eric
5 months ago
Standard variable cost, market price, and standard variable cost plus a profit margin seem like the most logical choices to prevent cost inefficiencies. I'm confident in those selections.
upvoted 0 times
...

Save Cancel