What is normally performed within the principal performance testing activity called Test Analysis and Design?

i. Determine scope of performance testing

ii. Establish action plans should performance issues arise

iii. in Create the test environment

iv. Identify risks to the performance tests

v. Determine load levels, tiring parameters, and transactions to be tested

Show Suggested Answer Hide Answer
Suggested Answer: A

Contribute your Thoughts:

0/2000 characters
Bette
4 months ago
I’m pretty sure all those points are part of the analysis process.
upvoted 0 times
...
Gladys
4 months ago
I thought action plans were more of a post-testing thing?
upvoted 0 times
...
Cyril
4 months ago
Wait, are we really creating the test environment in this phase?
upvoted 0 times
...
Dalene
4 months ago
I think identifying risks is just as important!
upvoted 0 times
...
Tamera
5 months ago
Definitely agree that determining scope is key!
upvoted 0 times
...
Yesenia
5 months ago
I feel like creating the test environment is more of a setup task rather than part of the analysis and design.
upvoted 0 times
...
Harrison
5 months ago
I remember practicing a question similar to this, and I think identifying risks is definitely part of the analysis phase.
upvoted 0 times
...
Hermila
5 months ago
I think the main focus of Test Analysis and Design is to determine the scope of performance testing, but I'm not sure if that includes establishing action plans.
upvoted 0 times
...
Toi
5 months ago
I’m leaning towards option D because it seems like determining load levels is crucial, but I’m not entirely confident about the other parts.
upvoted 0 times
...
Alana
5 months ago
I'm confident the answer is A, advanced production scheduling (APS). That technique takes into account the bills of material to plan capacity and scheduling.
upvoted 0 times
...
Paola
5 months ago
I'm a bit confused by the different options. It seems like there are a lot of details to weigh, like the sponsor information, the legal issues, and the funding requirements. I'll need to make sure I understand how each of those factors into the performance testing plan.
upvoted 0 times
...
Frederic
5 months ago
Ugh, corporate governance questions always trip me up. I'm going to carefully read each option and look for the subtle difference.
upvoted 0 times
...

Save Cancel