Henry is the project manager of the QBG Project for his company. This project has a budget of $4,576,900 and is expected to last 18 months to complete. The CIO, a stakeholder in the project, has introduced a scope change request for additional deliverables as part of the project work. What component of the change control system would review the proposed changes' impact on the features and functions of the project's product?

Show Suggested Answer Hide Answer
Suggested Answer: A

The configuration management system ensures that proposed changes to the project's scope are reviewed and evaluated for their affect on

the project's product.

Configuration Management System is a subsystem of the overall project management system. It is a collection of formal documented

procedures used to identify and document the functional and physical characteristics of a product, result, service, or component of the project.

It also controls any changes to such characteristics, and records and reports each change and its implementation status. It includes the

documentation, tracking systems, and defined approval levels necessary for authorizing and controlling changes. Audits are performed as part

of configuration management to determine if the requirements have been met.

Answer B is incorrect. The scope change control system focuses on reviewing the actual changes to the project scope. When a change

to the project's scope is proposed, the configuration management system is also invoked.

Answer C is incorrect. The cost change control system is responsible for reviewing and controlling changes to the project costs.

Answer D is incorrect. Integrated change control examines the affect of a proposed change on the project as a whole.


Contribute your Thoughts:

0/2000 characters
Clorinda
4 months ago
Not sure if Integrated change control covers all aspects.
upvoted 0 times
...
Zack
4 months ago
Configuration management system is too narrow for this.
upvoted 0 times
...
Malcom
4 months ago
Surprised they didn't mention the cost implications!
upvoted 0 times
...
Isadora
4 months ago
I think it's the Scope change control system.
upvoted 0 times
...
Lina
5 months ago
It's definitely the Integrated change control.
upvoted 0 times
...
Refugia
5 months ago
I practiced a similar question where integrated change control was emphasized for evaluating changes, so I’m leaning towards that option.
upvoted 0 times
...
Nickole
5 months ago
I feel like configuration management system could also be relevant, but it seems more focused on maintaining product integrity rather than assessing changes.
upvoted 0 times
...
Michal
5 months ago
I'm not entirely sure, but I remember something about integrated change control being important for overall project impact.
upvoted 0 times
...
Josefa
5 months ago
I think the scope change control system might be the right answer since it deals with changes in project deliverables.
upvoted 0 times
...
Yuette
5 months ago
I'm a bit confused by the options. I'll need to carefully read through each one and think about how tasks and subtasks are used in different contexts.
upvoted 0 times
...
Rueben
5 months ago
I don't recall much about "sequential" or "database" types, though. They don't sound right to me.
upvoted 0 times
...
Diane
5 months ago
I feel a bit confused; I thought a LAN was just for local setups, but connecting several cities makes me lean towards WAN as well.
upvoted 0 times
...

Save Cancel