Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

IBM C9530-404 Exam

Status: RETIRED
Certification Provider: IBM
Exam Name: IBM Integration Bus V9.0
Duration: 120 Minutes
Number of questions in our database: 48
Exam Version: 21-01-2018
C9530-404 Exam Official Topics:
  • Topic 1: Integration Architecture and Design Development of IBM Integration Bus V9.0 Solutions Extending IBM Integration Bus With Adapters and Other Products Explain the core architecture
  • Topic 2: components
  • Topic 3: and operating environments. Apply appropriate transpor
Disscuss IBM C9530-404 Topics, Questions or Ask Anything Related

Currently there are no comments in this discussion, be the first to comment!

Free IBM C9530-404 Exam Actual Questions

The questions for C9530-404 were last updated On 21-01-2018

Question #1

A solution developer needs to implement a message flow to integrate with a Telecommunications Short Message Service (SMS) server which uses the Simple Network Management Protocol (SNMP) over a socket layer. The message flow starts with an MQinput node which accepts the XML input message that contains the SMS details. The message is routed to a Compute node to compose the SNMP format as expected by the SMS service.

Which node should the developer use to send the SNMP data?

Reveal Solution Hide Solution
Correct Answer: C

Question #2

A solution developer wants to use the global cache functionality to share data between two Integration nodes which are running on separate host machines.

What must the developer configure to accomplish the requirements?

Reveal Solution Hide Solution
Correct Answer: A

Configure one or more integration nodes to share data in the global cache by using a cache policy file. Use a cache policy to enhance the availability of the cache by configuring an integration node to host two catalog servers.Also use a cache policy file to host container servers in a multi-instance integration node for high availability.


Question #3

A solution developer has created the following message flow:

The integration requirements state that the name for the output file needs to be computed from the message payload.

How can the developer implement this requirement in the Mapping node?

Reveal Solution Hide Solution
Correct Answer: A

Question #4

A solution developer has developed a message flow that is in an application named App5, shown below.

A second application, named TestService, contains the message flow that processes messages sent from the Send MQ to TestService MQ Output node and returns the response message that is then retrieved by the MQ Get node. This application is already deployed to the Integration Server that is named default.

The solution developer wants to use the Test Client to test App5. The Test Client preferences are the defaults. The application has been deployed using a BAR file named App5.bar to the Integration Server that is named default.

What configuration is required in the Test Client to test App5 to the end of the message flow?

Reveal Solution Hide Solution
Correct Answer: B

Question #5

A solution developer installed the IBM Integration Bus runtime and the Integration Toolkit using the ''Developer Edition'' on a Windows 64 bit environment.

Which integration server functionality is available for the developer?

Reveal Solution Hide Solution
Correct Answer: C

Inscalemode, the broker operates with a limited set of nodes for use with unlimited integration servers.


http://www-01.ibm.com/support/knowledgecenter/SSMKHH_9.0.0/com.ibm.etools.mft.doc/bn28100_.htm


Unlock all C9530-404 Exam Questions with Advanced Practice Test Features:
  • Select Question Types you want
  • Set your Desired Pass Percentage
  • Allocate Time (Hours : Minutes)
  • Create Multiple Practice tests with Limited Questions
  • Customer Support
Get Full Access Now

Save Cancel