Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
Suggested Answer: D
Get Premium C1000-132 Questions
as Interactive Web-Based Practice Test or PDF
Real Exam Format
Detailed Explanations
Instant Access
Get Your Practice Test
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.
28 comments · newest first
AL
Alisha
10 months ago
Yeah, Warning Limit makes the most sense!
ME
Melina
10 months ago
I thought it was the Action Limit?
HI
Hillary
10 months ago
Meter Limit is not the right choice here.
CR
Craig
10 months ago
Wait, is it really the Warning Limit? Seems off.
MA
Mary
11 months ago
It's definitely the Warning Limit.
DA
Danilo
11 months ago
I have a feeling it might be the Measurement Limit, but I can't recall the specifics from my notes.
DO
Donette
11 months ago
I’m a bit confused; I thought the Meter Limit was the one used for monitoring, but I could be mixing it up with something else.
FR
Freeman
11 months ago
I remember practicing a question similar to this, and I feel like the Action Limit was mentioned as important for triggering alerts.
TE
Terrilyn
12 months ago
I think the limit we use for a Condition Monitoring Point is the Warning Limit, but I'm not entirely sure.
CO
Cora
12 months ago
I've got a good feeling about this one. The Meter Limit is used to trigger the Condition Monitoring Point, so that's the answer I'm going with.
AL
Alysa
12 months ago
The key here is understanding the purpose of a Condition Monitoring Point. I think the Action Limit is the correct answer, since that's the limit that triggers the monitoring point to take action.
TR
Trinidad
1 year ago
Hmm, I'm a bit confused on this one. I'll need to review the material on Condition Monitoring Points and Meter Types again to make sure I understand the difference between the limit options.
CH
Cherry
1 year ago
I'm pretty sure the answer is Warning Limit, since that's the limit that triggers a Condition Monitoring Point with a GAUGE Meter Type.
EL
Elfriede
2 years ago
I'm not sure, but I think it might be C) Measurement Limit for accurate monitoring.
LE
Lemuel
2 years ago
Oooh, this is a tough one. I'm feeling like C. Measurement Limit might be the answer, but then again, who doesn't love a good ol' Action Limit? I'll go with D and hope for the best!
LO
Loren
2 years ago
Hmm, I'm going to go with B. Warning Limit. It's like a heads up before the real action happens, you know? Although, I do enjoy a good action sequence, so maybe D is the way to go.
KE
Keneth
2 years ago
I believe it's D) Action Limit because that's when action needs to be taken.
WA
Wava
2 years ago
D is the correct answer for sure. I mean, what else would it be? Meter Limit? That's just silly. This question is too easy!
GR
Graham
2 years ago
D) Action Limit is the only logical choice here.
MA
Margot
2 years ago
Definitely D) Action Limit, no doubt about it.
WA
Wava
2 years ago
Yeah, I agree. D) Action Limit makes the most sense.
VA
Val
2 years ago
I think it's D) Action Limit.
MI
Minna
2 years ago
I think the answer is B) Warning Limit.
LU
Luis
2 years ago
I think the answer is D. Action Limit. It just makes sense, you know? That's the limit that would actually trigger the Condition Monitoring Point.
FA
Fabiola
2 years ago
I believe it's A) Meter Limit, as that would be the most logical choice.
JA
Janine
2 years ago
I think it's B) Warning Limit, because that's when you would want to be alerted.
VA
Val
2 years ago
I'm not sure, but I think it might be C) Measurement Limit.
HY
Hyun
2 years ago
I agree, D. Action Limit seems like the correct choice.