Free Huawei H12-351_V1.0 Exam Actual Questions

The questions for H12-351_V1.0 were last updated On Sep. 15, 2023

Question #1

Satellite positioning can achieve high positioning accuracy in both indoor and outdoor scenarios.

Reveal Solution Hide Solution
Correct Answer: B

Satellite positioning can achieve high positioning accuracy in outdoor scenarios, but not in indoor scenarios. This is because satellite signals are easily blocked or interfered by buildings, walls, ceilings, and other obstacles in indoor environments.


Question #2

In the early phase of a project, after the project requirements are clarified, the project owner should Checklist to describe the customer's requirements. (Capitalize the first letter of each word.)

Reveal Solution Hide Solution
Correct Answer: A

Customer Requirement Specification (CRS) is a document that needs to be output after the project requirements are clarified. The CRS describes the customer's requirements in detail and serves as the basis for subsequent project design and delivery.


Question #3

During a project lifecycle, the______ document needs to be output after the high level design be output after the low level design is complete. (Enter the acronyms in capital letters.)

Reveal Solution Hide Solution
Correct Answer: A

ATP stands for Acceptance Test Plan, which is a document that needs to be output after the low level design is complete. The ATP describes the acceptance criteria and test cases for the project.


Question #4

In the early phase of a project, after the project requirements are clarified, the project owner should Checklist to describe the customer's requirements. (Capitalize the first letter of each word.)

Reveal Solution Hide Solution
Correct Answer: A

Customer Requirement Specification (CRS) is a document that needs to be output after the project requirements are clarified. The CRS describes the customer's requirements in detail and serves as the basis for subsequent project design and delivery.


Question #5

Which of the following statements about the access layer design are true when Huawei's CloudCampus Solution is applied to small and midsize campus networks? (Select All that Apply)

Reveal Solution Hide Solution
Correct Answer: B, C

A is false because in the mini-store scenario, APs can directly connect to egress links and support NAT if Wi-Fi coverage is required. There is no need to deploy egress devices separately.



Unlock all H12-351_V1.0 Exam Questions with Advanced Practice Test Features:
  • Select Question Types you want
  • Set your Desired Pass Percentage
  • Allocate Time (Hours : Minutes)
  • Create Multiple Practice tests with Limited Questions
  • Customer Support
Get Full Access Now
Disscuss Huawei H12-351_V1.0 Topics, Questions or Ask Anything Related

Save Cancel