Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Huawei H35-560 Exam - Topic 2 Question 78 Discussion

Which signaling is triggered by the statistics of the number of successful establishments of the RRC connection establishment?
C) RRC connection setup complete
A) RRC connection setup
B) RRC connection request
D) RRC connection reconfiguration complete

Huawei H35-560 Exam - Topic 2 Question 78 Discussion

Actual exam question for Huawei's H35-560 exam
Question #: 78
Topic #: 2
[All H35-560 Questions]

Which signaling is triggered by the statistics of the number of successful establishments of the RRC connection establishment?

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

0/2000 characters
Willard
10 months ago
Really? I’m not sure about that, seems off.
upvoted 0 times
...
Karan
10 months ago
I agree, RRC connection request makes the most sense.
upvoted 0 times
...
Belen
10 months ago
Wait, isn't it the RRC connection setup complete?
upvoted 0 times
...
Monte
11 months ago
I thought it was the RRC connection setup.
upvoted 0 times
...
Sanjuana
11 months ago
It's definitely about the RRC connection request.
upvoted 0 times
...
Luisa
11 months ago
I vaguely recall that D relates to reconfiguration, but I don't think that's what this question is asking. It seems more focused on the initial setup.
upvoted 0 times
...
Tambra
11 months ago
I'm a bit confused. I feel like C could be the right answer since it mentions completion, but I need to double-check my notes.
upvoted 0 times
...
Frederica
11 months ago
I remember practicing a question similar to this, and I think it was about the RRC connection request signaling. So maybe B?
upvoted 0 times
...
Therese
12 months ago
I think the answer might be A, but I'm not entirely sure if it's specifically about the setup phase or something else.
upvoted 0 times
...
Luisa
12 months ago
Ah, this is a tricky one. The statistics of successful RRC connection establishment could potentially trigger a few different signaling events. I'm leaning towards either the RRC connection setup or the RRC connection complete, but I'll need to double-check my understanding to be sure.
upvoted 0 times
...
Tamie
12 months ago
Okay, let's see. The question is asking about which signaling is triggered by the statistics of successful RRC connection establishment. I'm thinking it's probably either the RRC connection setup or the RRC connection request, since those are the key steps in the process. I'll need to weigh the options carefully.
upvoted 0 times
...
Emmett
12 months ago
Hmm, I'm a bit unsure about this one. The wording is a bit technical, and I'm not entirely confident in my knowledge of RRC connection establishment. I'll need to think it through step-by-step to figure out the right answer.
upvoted 0 times
...
Shonda
12 months ago
This question seems to be testing my understanding of RRC connection establishment and the signaling involved. I'll need to carefully consider the different stages of the process and how the statistics of successful connections could trigger specific signaling.
upvoted 0 times
...
Carisa
2 years ago
Haha, Maurine, you crack me up! But seriously, I think the answer is A) RRC connection setup. It just makes the most sense to me based on the information provided.
upvoted 0 times
Markus
1 year ago
I'm not sure, but B) RRC connection request could also be a possibility.
upvoted 0 times
...
Emilio
1 year ago
I'm leaning towards D) RRC connection reconfiguration complete, actually.
upvoted 0 times
...
Ashton
1 year ago
I think it's C) RRC connection setup complete, but I see where you're coming from with A).
upvoted 0 times
...
Therese
2 years ago
I agree with you, A) RRC connection setup seems like the correct answer.
upvoted 0 times
...
...
Sheridan
2 years ago
I believe it's D) RRC connection reconfiguration complete, as it indicates the completion of the reconfiguration process.
upvoted 0 times
...
Maurine
2 years ago
I'm going to have to disagree with you both. The correct answer is clearly D) RRC connection reconfiguration complete. I mean, who doesn't love a good RRC reconfiguration, am I right? *wink wink*
upvoted 0 times
Mabel
1 year ago
I'm going to have to disagree with you both. The correct answer is clearly D) RRC connection reconfiguration complete. I mean, who doesn't love a good RRC reconfiguration, am I right? *wink wink*
upvoted 0 times
...
Sylvia
2 years ago
D) RRC connection reconfiguration complete
upvoted 0 times
...
Claribel
2 years ago
C) RRC connection setup complete
upvoted 0 times
...
Yolande
2 years ago
B) RRC connection request
upvoted 0 times
...
Leota
2 years ago
A) RRC connection setup
upvoted 0 times
...
...
Felicitas
2 years ago
I'm not sure, but I think it might be C) RRC connection setup complete.
upvoted 0 times
...
Jules
2 years ago
I agree with Annamaria, because the statistics trigger the setup of the RRC connection.
upvoted 0 times
...
Annamaria
2 years ago
I think the answer is A) RRC connection setup.
upvoted 0 times
...
Christiane
2 years ago
Hmm, I'm not so sure about that. I'm going to go with C) RRC connection setup complete. Seems like the signaling would be triggered by the completion of the RRC connection setup, not the request.
upvoted 0 times
Kenny
2 years ago
User 2: I'm going with C) RRC connection setup complete
upvoted 0 times
...
Jerry
2 years ago
User 1: I think it's A) RRC connection setup
upvoted 0 times
...
...
Carol
2 years ago
I think it's B) RRC connection request. The question specifically mentions 'the statistics of the number of successful establishments', which sounds like it's referring to the connection request process.
upvoted 0 times
Amalia
2 years ago
I believe it's C) RRC connection setup complete.
upvoted 0 times
...
Hector
2 years ago
I think it's B) RRC connection request.
upvoted 0 times
...
...

Save Cancel