Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Huawei H20-923_V1.0 Exam - Topic 9 Question 10 Discussion

Actual exam question for Huawei's H20-923_V1.0 exam
Question #: 10
Topic #: 9
[All H20-923_V1.0 Questions]

Which of the following can be used to start the inverter of the UPS5000-H?

Show Suggested Answer Hide Answer
Suggested Answer: A, C

For the Huawei UPS5000-H, inverter startup is executed through the UPS's own control interfaces, which provide the ''Running Control / Inv. ON'' operation with the required confirmations and permissions. The UPS LCD (MDU touchscreen) supports inverter startup through menu operations such as selecting inverter start functions and confirming the action after authentication. The UPS WebUI also provides the same operational control path, where an operator logs in and issues the Inv. ON command under the UPS monitoring/running control pages. These two interfaces are part of the UPS monitoring and control design and are explicitly used for commissioning and routine O&M actions.

By contrast, ECC (data center controller) and NetEco (management platform) are mainly used for site-level monitoring, alarm collection, visualization, reporting, and centralized management. While they can display UPS status and alarms (and may integrate with UPS data), inverter startup is defined as a UPS running control operation performed on the UPS's LCD or WebUI control plane to ensure proper authorization, safety checks, and command traceability.


Contribute your Thoughts:

0/2000 characters

Currently there are no comments in this discussion, be the first to comment!


Save Cancel