Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Huawei H13-629 Exam - Topic 4 Question 82 Discussion

Actual exam question for Huawei's H13-629 exam
Question #: 82
Topic #: 4
[All H13-629 Questions]

In the OceanStor VIS6600T dual-redundant switch network environment, using OceanStor Toolkit inspection found that "multi-path state detection "does not pass the inspection report. It is found that there are two routes in the 4 paths of the VIS6600T device's 0 node to each LUN of the array. The path status is disabled. According to the analysis, the switch port connected to port 0 of port A0 of node 0 on node 0 of the VIS6600T is visible on the optical switch. The received optical power is much lower than the rated power of the optical module.

What actions should be taken to fix this?

Show Suggested Answer Hide Answer
Suggested Answer: D

Contribute your Thoughts:

0/2000 characters
Mitsue
17 days ago
I think reseating the FC interface card could help too.
upvoted 0 times
...
Nada
23 days ago
Sounds like a faulty optical module issue.
upvoted 0 times
...
Ruby
1 month ago
I’m a bit confused about the options. Should we be looking at the optical module on the switch or the device itself? I feel like both could be relevant.
upvoted 0 times
...
Whitley
2 months ago
I think we had a practice question about this, and it pointed towards replacing the optical module on the switch side. That makes sense here too.
upvoted 0 times
...
Emilio
2 months ago
I'm not entirely sure, but I feel like reseating the FC interface card could also help if there's a connection issue.
upvoted 0 times
...
Jeff
2 months ago
I remember we discussed something similar in class about optical power issues. I think replacing the optical module might be the right move.
upvoted 0 times
...

Save Cancel