Which of the following operations need to be performed before deployment in Easy mode? (Select All that Apply)
The Easy mode in Huawei's iMaster NCE-Fabric simplifies VXLAN fabric deployment with automated configuration. Certain pre-deployment steps are required. Let's evaluate each option:
A . Disable data synchronization upon going online for the first time: This is false. Data synchronization is typically enabled by default to ensure consistency; disabling it is not a standard pre-deployment step and is optional based on specific needs. FALSE.
B . Load the license: This is true. A valid license must be loaded into iMaster NCE-Fabric before deployment to unlock features, including Easy mode functionality. TRUE.
C . Pre-configure the access ports: This is true. Access ports on devices (e.g., server leaf nodes) need to be pre-configured (e.g., with VLANs or basic settings) to ensure connectivity before Easy mode automation begins. TRUE.
D . Configure an SSH fingerprint verification policy: This is false. SSH fingerprint verification is part of security configuration but is not a mandatory pre-deployment step for Easy mode; it can be set post-deployment or is automated. FALSE.
Thus, B (Load the license) and C (Pre-configure the access ports) are required operations before deployment in Easy mode.
Lorenza
7 months agoStefania
7 months agoBlair
7 months agoNida
7 months agoBrendan
8 months agoHildegarde
8 months agoEdelmira
8 months agoLasandra
8 months agoBok
8 months agoTrevor
8 months agoAleisha
8 months agoFabiola
8 months agoKasandra
8 months agoIsaac
8 months ago