Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

HP Exam HPE6-A66 Topic 5 Question 11 Discussion

Actual exam question for HP's HPE6-A66 exam
Question #: 11
Topic #: 5
[All HPE6-A66 Questions]

NewStellar has a main corporate campus in a business park with two adjacent buildings that are 150 feet apart (46 meters). This is an open campus with no obstructions between the two buildings Each building has three floors and each floor is 322 x 175 feet (98 x 53 meters) for 56,350 square feet (5,235 square meters) total, which results in a total of 338,100 feet (31,410 square meters) for the entire building space. The ceiling for each floor is 12 feet (3.6 meters) high with a drop-down ceiling at 10 feet (3 meters) The network architect has given one floor to analyze. Building 1 Floor 2, shown in the attached exhibit.

This floor has a central main corridor with washrooms, stairs, elevators and supply, and network cabinets. There are cubicles around the perimeter of the floor. The central part main corridor's dimensions contain 9,350 square feet (870 square meters).

The company has determined that Wi-Fi coverage will not include the central area of each floor, which includes the washrooms, stairs, elevators and supply and network cabinets. Based on a capacity design, approximately how many APs should a network architect add to each floor to plan the design in VisuaiRF?

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

Currently there are no comments in this discussion, be the first to comment!


Save Cancel