A company has two buildings on a campus, where each building has three floors, which two wiring closets per floor Assume that there will be 24 APs connected via POE+ to each wiring closet, along with 128 wired user connections. Which backplane stacking solution will provide the necessary Ethernet port capacity for all devices on Building 1 Floor 2 and is fully meshed?

Show Suggested Answer Hide Answer
Suggested Answer: C