Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

HP Exam HPE6-A47 Topic 2 Question 7 Discussion

Actual exam question for HP's HPE6-A47 exam
Question #: 7
Topic #: 2
[All HPE6-A47 Questions]

Refer to the exhibit.

The exhibit shows information about a customer's existing equipment in a closet. The customer needs an upgrade for this closet. The architect plans to:

Replace the switches with two Aruba 3810M switches

Connect the 3810M switches in a backplane stack

Upgrade the uplinks to two 40GbE links for the entire backplane stack

What is required for this design?

Show Suggested Answer Hide Answer
Suggested Answer: A

Comments

Currently there are no comments in this discussion, be the first to comment!


Save Cancel