A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?
Submit Cancel