GAQM ISO-IEC-LI Exam - Topic 7 Question 41 Discussion
Which of the following measures is a preventive measure?
C) Putting sensitive information in a safe
A) Installing a logging system that enables changes in a system to be recognized
B) Shutting down all internet traffic after a hacker has gained access to the company systems
D) Classifying a risk as acceptable because the cost of addressing the threat is higher than the value of the information at risk