I feel like Specifications could also be a contender for the second step, but I lean towards Systems Analysis based on what we discussed in our study group.
Okay, let me think this through step-by-step. First is the Feasibility Study, then Systems Analysis, followed by Specifications. I'm confident B is the correct answer.
Hmm, I'm a bit unsure about this one. I know the steps involve planning and design, but I can't quite remember the exact order. I'll have to think this through carefully.