Which of the following is a second step in Systems Design Life Cycle?
Suggested Answer: B
Get Premium CITM-001 Questions
as Interactive Web-Based Practice Test or PDF
Real Exam Format
Detailed Explanations
Instant Access
Get Your Practice Test
13 comments · newest first
BE
Bettina
10 months ago
Feasibility Study comes first, right?
TA
Tarra
10 months ago
I thought it was Specifications?
HE
Hermila
11 months ago
Wait, Training isn't a step in the cycle?
AN
Anthony
11 months ago
Seems like Systems Analysis is the right answer, but I'm not 100% sure.
FE
Fernanda
11 months ago
Systems Analysis is definitely the second step!
AN
Anjelica
11 months ago
Training seems way too late in the process to be the second step. I think it has to be either A or B, but I can't recall the exact order.
MI
Mitzie
12 months ago
I feel like Specifications could also be a contender for the second step, but I lean towards Systems Analysis based on what we discussed in our study group.
PA
Paris
12 months ago
I remember practicing a question similar to this, and I believe the Feasibility Study comes first, so Systems Analysis should be the second step.
RO
Rozella
12 months ago
I think the second step is Systems Analysis, but I'm not entirely sure. We covered it in class, but I might be mixing it up with the first step.
CH
Chun
1 year ago
Training? That doesn't sound right for the second step. I'm leaning towards either A or B, but I'll have to double-check my notes to be sure.
BR
Brittney
1 year ago
Okay, let me think this through step-by-step. First is the Feasibility Study, then Systems Analysis, followed by Specifications. I'm confident B is the correct answer.
TO
Torie
1 year ago
Hmm, I'm a bit unsure about this one. I know the steps involve planning and design, but I can't quite remember the exact order. I'll have to think this through carefully.
CH
Chun
1 year ago
I'm pretty sure the second step in the Systems Design Life Cycle is Systems Analysis, so I'll go with option B.