Halloween Special 2026! Get Up to 25% OFF Practice Questions! Limited Time - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

GAQM CITM-001 Exam - Topic 2 Question 20 Discussion

Posted by Davida on Nov 20, 2025 at 05:33 PM

Which of the following is a ninth step in Systems Design Life Cycle?

Get Premium CITM-001 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
30 comments · newest first
GI
Gilberto 6 months ago
Operations is essential, but I think it's A) Conversion too.
HY
Hyun 6 months ago
I agree with Nan. Conversion makes sense for the ninth step.
JO
Josphine 7 months ago
C) System Analysis is too early for step nine.
IL
Ilda 7 months ago
I lean towards D) Operations. It's where everything runs.
GL
Gladys 7 months ago
I feel B) Building fits better. It's a crucial phase.
OL
Olene 7 months ago
Wait, isn't System Analysis part of an earlier step?
LE
Lelia 7 months ago
I always thought it was B) Building.
RO
Ronna 8 months ago
Nah, it's definitely D) Operations.
KR
Krissy 8 months ago
I think it's A) Conversion.
BU
Bulah 8 months ago
A) Conversion? Really? I thought that was more of a database thing, not part of the systems design life cycle.
LI
Lisha 8 months ago
Haha, I bet the real answer is "Turning it off and on again." That's the ninth step in every IT process!
RO
Ronnie 9 months ago
C) System Analysis can't be the answer. That's usually an earlier step in the process.
CY
Cyndy 9 months ago
I feel like C) System Analysis is too early in the cycle to be the ninth step. Maybe it's A) Conversion after all?
KR
Kris 9 months ago
I practiced a similar question last week, and I remember that building is usually earlier in the process. So, I don't think it's B) Building.
KI
King 9 months ago
I'm not entirely sure, but I remember discussing the importance of operations in the lifecycle. Could it be D) Operations?
JO
Joaquin 9 months ago
I think the ninth step might be related to the implementation phase, so I'm leaning towards A) Conversion.
ST
Stephania 9 months ago
I feel pretty good about this one. If I remember correctly, the ninth step is usually related to ongoing maintenance and support of the deployed system. I'll go with D) Operations.
EA
Earnestine 10 months ago
Conversion or operations sound like they could be potential ninth steps, but I'm not 100% sure. I'll have to eliminate the other options and see which one makes the most sense.
JO
Jody 10 months ago
Okay, let's see. The key steps are usually things like requirements gathering, design, implementation, and testing. I'm guessing the ninth step has to do with maintaining or operating the system, but I'm not totally confident.
NA
Nan 10 months ago
I think it's A) Conversion. Seems logical.
AL
Almeta 10 months ago
D) Operations seems like the correct answer to me. The systems design life cycle doesn't end with just building the system.
WI
Willodean 10 months ago
I think the answer is B) Building. That's the logical next step after the analysis phase.
DO
Donte 11 months ago
Really surprised that Operations is considered a ninth step!
JA
Jani 11 months ago
I think I remember learning about the steps in this process, but I'm drawing a blank on the ninth step. Let me think this through carefully.
MA
Major 11 months ago
Hmm, I'm not sure about this one. The Systems Design Life Cycle is something I need to review more closely.
AR
Aron 6 months ago
↳ replying to Major
What about System Analysis?
SH
Shaniqua 6 months ago
↳ replying to Major
Building sounds right to me.
PE
Pete 6 months ago
↳ replying to Major
I lean towards Conversion.
KA
Kaitlyn 6 months ago
↳ replying to Major
I think it might be Operations.
RO
Rosio 11 months ago
↳ replying to Major
I’m confused, need to study more!
0/2000 characters

Save Cancel