A system administrator has a distribution switch with four uplinks to the core switch in a single aggregated link. The aggregated link requires all four connections to be up to function. Which of the following is this MOSTLY an example of?
Suggested Answer: C
Get Premium CCCP-001 Questions
as Interactive Web-Based Practice Test or PDF
Real Exam Format
Detailed Explanations
Instant Access
Get Your Practice Test
11 comments · newest first
IZ
Izetta
12 months ago
I disagree, it’s not just about load balancing here.
HE
Heike
12 months ago
Wait, all four connections need to be up? That seems risky...
ER
Eric
1 year ago
Definitely high availability with multipathing!
GO
Golda
1 year ago
I think it's more about load balancing with high availability.
TR
Tracie
1 year ago
Sounds like a classic case of fault tolerance with multipathing.
CH
Charlie
1 year ago
I recall a question similar to this, and I think it was about load balancing without high availability. But I'm not confident about that.
AN
Antione
1 year ago
This sounds like a tricky one. I feel like it could be high availability with multipathing, but I need to think it through more.
SH
Shonda
1 year ago
I'm not entirely sure, but I remember something about load balancing and high availability from our practice questions.
HE
Helga
1 year ago
I think this might be related to fault tolerance since all connections need to be up for the link to work.
DO
Dona
1 year ago
Hmm, I'm a bit unsure about this one. There are a few different options, and I'm not entirely sure which one is the correct approach for the Release Train Engineer during this stage of PI Planning.
LI
Linsey
1 year ago
I'm pretty sure the answer is B - an active currency. That's the only option that makes sense to me for importing Lead records.