Refer to the exhibit.

During a planned upgrade to a BIG-IP HA pair running Active/Standby, an outage to application traffic is reported shortly after the Active unit is forced to Standby. Reverting the failover resolves the outage. What should the BIG-IP Administrator modify to avoid an outage during the next failover event? (Choose one answer)

Show Suggested Answer Hide Answer
Suggested Answer: D

Comprehensive and Detailed Explanation (BIG-IP Administration -- Data Plane Concepts):

In an Active/Standby BIG-IP design, application availability during failover depends on both units having equivalent data-plane connectivity for the networks that carry application traffic. Specifically:

VLANs are bound to specific interfaces (and optionally VLAN tags).

Floating self IPs / traffic groups move to the new Active device during failover.

For traffic to continue flowing after failover, the new Active device must have the same VLANs available on the correct interfaces that connect to the upstream/downstream networks.

What the symptom tells you:

Traffic works when Device A is Active

Traffic fails when Device B becomes Active

Failback immediately restores traffic

This pattern strongly indicates the Standby unit does not have the VLAN connected the same way (wrong physical interface assignment), so when it becomes Active, it owns the floating addresses but cannot actually pass traffic on the correct network segment.

Why Interface mismatch is the best match:

If the Active unit is already working, its interface mapping is correct.

The fix is to make the Standby unit's VLAN/interface assignment match the Active unit.

That corresponds to changing the Standby device interface to 1.1.

Why the Tag options are less likely here (given the choices and the exhibit intent):

Tag issues can also break failover traffic, but the question/options are clearly driving toward the classic HA requirement: consistent VLAN-to-interface mapping on both devices so the data plane remains functional after the traffic group moves.

Conclusion: To avoid an outage on the next failover, the BIG-IP Administrator must ensure the Standby device uses the same interface (1.1) for the relevant VLAN(s) that carry the application traffic, so when it becomes Active it can forward/receive traffic normally.


Contribute your Thoughts:

0/2000 characters
Thea
6 days ago
This question feels similar to one we practiced where we had to adjust interface settings. I think it might be related to the Standby device's interface.
upvoted 0 times
...
Arlen
11 days ago
I remember something about the Tag value being important for failover, but I'm not sure if it should be on the Active or Standby device.
upvoted 0 times
...
Delbert
16 days ago
I've got a good feeling about this one. The key is to identify the setting that's most likely to cause an outage during a failover. I'll carefully consider each option and try to eliminate the less likely ones.
upvoted 0 times
...
Valentin
21 days ago
I'm a bit confused by this one. The exhibit doesn't provide a lot of detail, and the answer choices seem pretty similar. I'll need to really think through the HA setup and what could be causing the issue.
upvoted 0 times
...
Sharan
26 days ago
Alright, I think I've got a strategy here. I'll need to focus on the HA settings and see which one is most likely to cause an outage during a failover. Time to read through the options carefully.
upvoted 0 times
...
Wayne
1 month ago
Okay, let's see. The question mentions a failover event, so I'm guessing the issue has something to do with the HA configuration. I'll need to consider the different settings that could be causing the problem.
upvoted 0 times
...
William
1 month ago
Hmm, this seems like a tricky one. I'll need to carefully review the exhibit and think through the potential causes of the outage.