Exin CDCS Exam - Topic 2 Question 30 Discussion

What is the redundancy setup shown in the diagram?
B) N+2
A) 2+N+1
C) N+N+N
D) 2(N+1)

Exin CDCS Exam - Topic 2 Question 30 Discussion

Actual exam question for Exin's CDCS exam
Question #: 30
Topic #: 2
[All CDCS Questions]

What is the redundancy setup shown in the diagram?

Show Suggested Answer Hide Answer
Suggested Answer: B

The diagram shows three UPS modules, each 100 kW, connected in parallel to support a 100 kW IT load. That means:

One module (100 kW) can support the load (N).

Two additional modules are installed as redundancy.

This equals N+2 redundancy.

2+N+1 and 2(N+1) imply dual active paths not shown.

N+N+N is not an industry term.

Thus, the correct redundancy level is N+2.


Contribute your Thoughts:

0/2000 characters
Sherrell
3 days ago
I'm leaning towards D) 2(N+1) because it sounds familiar, but I need to double-check my notes on redundancy setups.
upvoted 0 times
...
Erinn
8 days ago
I remember practicing a question similar to this, and I think N+2 was a common answer, but I can't recall the specifics.
upvoted 0 times
...
Junita
13 days ago
I think the redundancy setup might be 2+N+1, but I'm not entirely sure how to differentiate it from the others.
upvoted 0 times
...