Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Dell D-XTR-MN-A-24 Exam - Topic 3 Question 16 Discussion

Posted by Irma on Nov 14, 2024 at 05:38 AM

Which command is used to initiate a Storage Controller power supply replacement for XtremlO cluster ABC123?

Suggested Answer: B

To replace a power supply unit (PSU) in a storage controller of an XtremIO cluster, a specific command needs to be executed.

The correct command to initiate this process is replace-storage-controller-psu sc-psu-id=1 cluster-id='ABC123'.

This command specifies the action to replace the PSU (replace-storage-controller-psu), the PSU ID (sc-psu-id=1), and the specific cluster ID (cluster-id='ABC123').

Using this command ensures that the correct PSU in the specified cluster is prepared for replacement.


Get Premium D-XTR-MN-A-24 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
30 comments · newest first
OZ
Ozell 10 months ago
Are we sure about this? Sounds off.
KA
Kanisha 11 months ago
I agree with C, seems right.
CL
Claudia 11 months ago
Wait, is it really that simple?
CE
Celestine 11 months ago
I think it's B, not C.
VA
Vashti 11 months ago
It's definitely option C!
GE
Gertude 12 months ago
I think option C looks familiar, but I can't recall if it needs the "psu" or not. I hope I remember the right syntax!
AU
Audry 12 months ago
I’m a bit confused about the sc-psu-id part. Did we cover if that’s necessary for the command to work?
AN
Antonio 12 months ago
I remember practicing a similar question, and I feel like "replace-storage-controller-psu" was the right format for replacing a power supply.
CA
Carlene 1 year ago
I think the command should start with "replace-storage-controller", but I'm not sure if it needs "prepare" or "psu" in it.
CA
Cammy 1 year ago
I'm feeling a bit lost on this one. The terminology and specific commands are not something I'm familiar with. I'll try to eliminate the options that don't seem relevant, but I'm not confident I'll get this one right.
LE
Leslee 1 year ago
Okay, let me think this through. The question is asking for the command to initiate the power supply replacement, so I'm guessing the "replace-storage-controller-psu" part is the key. Option C seems the most straightforward, but I'll double-check the other options just to be sure.
GE
Georgeanna 1 year ago
Hmm, I'm not entirely sure about this one. The commands all look similar, and I'm not familiar with the specific XtremlO cluster commands. I'll need to review the documentation carefully to make sure I choose the right one.
CO
Corrie 1 year ago
I think the answer is B. The question specifically asks for the command to initiate a Storage Controller power supply replacement, and the command in option B includes the "replace-storage-controller-psu" keyword along with the cluster ID.
KA
Kattie 2 years ago
Wait, does this mean I have to manually replace the power supply? I was hoping for a remote control option. Where's the easy button?
TA
Tanja 2 years ago
Hmm, I'd go with option C. It's the most straightforward command and doesn't require any additional parameters.
SH
Sheridan 2 years ago
↳ replying to Tanja
User 2: Yeah, it seems like the simplest choice.
RE
Refugia 2 years ago
↳ replying to Tanja
User 1: I think option C is the way to go.
GE
Geraldo 2 years ago
I hear you, buddy. Replacing hardware components is never fun, especially when you're dealing with a cluster. Maybe they'll come up with a 'one-click power supply replacement' feature in the next version.
KI
Kirk 2 years ago
↳ replying to Geraldo
D) replace-storage-controller-prepare sc-psu-id=1 cluster-id=ABC123
IV
Ivory 2 years ago
↳ replying to Geraldo
C) replace-storage-controller-psu cluster-id=ABC123
LA
Laticia 2 years ago
↳ replying to Geraldo
B) replace-storage-controller-psu sc-psu-id=1 cluster-id=ABC123
ST
Stanford 2 years ago
↳ replying to Geraldo
A) replace-storage-controller-prepare cluster-id=ABC123
JA
Jacki 2 years ago
I'm not sure, but I think C) replace-storage-controller-psu cluster-id=ABC123 could also be a valid option as it directly mentions replacing the power supply for the Storage Controller.
HY
Hyun 2 years ago
I disagree, I believe the correct command is D) replace-storage-controller-prepare sc-psu-id=1 cluster-id=ABC123 because it specifically mentions preparing for power supply replacement.
LI
Lilli 2 years ago
I think the answer is B) replace-storage-controller-psu sc-psu-id=1 cluster-id=ABC123.
DI
Dierdre 2 years ago
Option B looks like the correct one, it specifies the SC-PSU-ID which is required for the replacement process.
TA
Tawanna 2 years ago
↳ replying to Dierdre
No problem, happy to help!
BR
Brianne 2 years ago
↳ replying to Dierdre
That makes sense, thanks for pointing that out.
CR
Cruz 2 years ago
↳ replying to Dierdre
Yes, option B specifies the SC-PSU-ID which is needed for the replacement process.
DO
Dorthy 2 years ago
↳ replying to Dierdre
I think option B is the correct one.
0/2000 characters

Save Cancel