Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Dell EMC Exam D-PST-MN-A-24 Topic 1 Question 28 Discussion

Actual exam question for Dell EMC's D-PST-MN-A-24 exam
Question #: 28
Topic #: 1
[All D-PST-MN-A-24 Questions]

What describes the SAS cabling when adding an expansion enclosure to a Dell EMC PowerStore, for each node and expansion enclosure side?

Show Suggested Answer Hide Answer
Suggested Answer: D

The correct description of the SAS cabling when adding an expansion enclosure to a Dell EMC PowerStore, for each node and expansion enclosure side, is Option D: SAS cabling goes from existing A ports to new B ports. At the last enclosure, SAS cabling returns from the A ports to the alternate node's B ports.

When adding a SAS expansion enclosure to a Dell EMC PowerStore system, the cabling must be done in a specific manner to ensure proper connectivity and performance.

The SAS cabling should start from the existing A ports on the base enclosure and connect to the new B ports on the expansion enclosure1.

At the last expansion enclosure in the chain, the SAS cabling should return from the A ports back to the B ports on the alternate node1.

This cabling method ensures that each node is connected to each expansion enclosure and that the enclosures are daisy-chained correctly for optimal performance and redundancy1.

For detailed cabling instructions and diagrams, it is recommended to consult the Dell PowerStore Installation and Service Guide or contact Dell EMC support for assistance.


Contribute your Thoughts:

Frederica
2 days ago
I remember reading about this, and I think the correct answer is B.
upvoted 0 times
...
Elizabeth
3 days ago
I'm not sure, but I think it might be D.
upvoted 0 times
...
Patrick
3 days ago
Oh man, these SAS cables are like a tangled web of confusion. I'm just gonna guess and hope for the best!
upvoted 0 times
...
Alyce
4 days ago
D looks good to me. Who needs A ports anyway? B ports are where it's at!
upvoted 0 times
...
Merilyn
5 days ago
I disagree, I believe the answer is C.
upvoted 0 times
...
Josphine
7 days ago
Hmm, this seems straightforward. I'll go with B. Gotta love those SAS ports!
upvoted 0 times
Nobuko
1 days ago
User 1: I think the answer is B. SAS cabling goes from existing A ports to new B ports.
upvoted 0 times
...
...
Shaun
15 days ago
I think the answer is A.
upvoted 0 times
...
Margurite
26 days ago
I think the answer is C. The description matches the SAS cabling setup for adding an expansion enclosure to a Dell EMC PowerStore.
upvoted 0 times
Ernestine
6 hours ago
Yes, and at the last enclosure, SAS cabling returns from the B ports to the originating node's A ports.
upvoted 0 times
...
Ty
2 days ago
I agree, the SAS cabling goes from existing B ports to new A ports.
upvoted 0 times
...
Kristian
7 days ago
That makes sense. It's important to follow the correct cabling setup to ensure proper connectivity when adding an expansion enclosure.
upvoted 0 times
...
Gaynell
9 days ago
Yes, you are correct. SAS cabling goes from existing B ports to new A ports. At the last enclosure, SAS cabling returns from the B ports to the originating node's A ports.
upvoted 0 times
...
Polly
10 days ago
I think the answer is C. The description matches the SAS cabling setup for adding an expansion enclosure to a Dell EMC PowerStore.
upvoted 0 times
...
...

Save Cancel