Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Cyber AB CMMC-CCP Exam - Topic 5 Question 22 Discussion

Posted by Ellsworth on Oct 20, 2026 at 08:07 PM

During an assessment, the Lead Assessor reviews the evidence for each CMMC in-scope practice that has been reviewed, verified, rated, and discussed with the OSC during the daily reviews. The Assessment Team records the final recommended MET or NOT MET rating and prepares to present the results to the assessment participants during the final review with the OSC and sponsor. As a part of this presentation, which document MUST include the attendee list, time/date, location/meeting link, results from all discussed topics, including any resulting actions, and due dates from the OSC or Assessment Team?

Suggested Answer: D

Understanding the Final Review Process in a CMMC Assessment

During aCMMC Level 2 Assessment, theAssessment Teamand theOrganization Seeking Certification (OSC)holddaily checkpoint meetingsto discuss progress, review evidence, and ensure transparency.

At theend of the assessment, afinal review meetingis conducted, during which theLead Assessor presents the results. Therecorded Daily Checkpoint logserves as theofficial document summarizing:

Theattendee list

Time, date, and locationof the final review

Final MET or NOT MET ratingsfor all practices

Discussion points, resulting actions, and due datesfor both the OSC and Assessment Team

Why 'D. Final and recorded Daily Checkpoint log' is Correct?

TheCMMC Assessment Process (CAP) Guidespecifies that all assessment findings and discussions must bedocumented throughout the assessment in daily checkpoint logs.

TheFinal and Recorded Daily Checkpoint Logincludes all necessary details, such as attendee lists, discussion topics, and action items.

This document isused to ensure all discussed topics and agreed-upon actions are properly tracked and recordedbefore submission.

Why Other Answers Are Incorrect?

A . Final log report (Incorrect)

There isno specific 'Final Log Report'required in CMMC assessments.

B . Final CMMC report (Incorrect)

TheFinal CMMC Reportdocuments the overall assessment results butdoes not serve as the official meeting logfor the final review discussion.

C . Final and recorded OSC CMMC report (Incorrect)

This documentdoes not include detailed discussion points from the daily checkpoint meetings.

Conclusion

The correct answer isD. Final and recorded Daily Checkpoint log, as this is the official document that captures thefinal meeting details, discussions, and action items.


CMMC Assessment Process (CAP) Guide

CMMC 2.0 Scoping and Assessment Guidelines

Get Premium CMMC-CCP Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
0 comments · newest first

Currently there are no comments in this discussion, be the first to comment!

0/2000 characters

Save Cancel