Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Cisco 350-601 Exam - Topic 14 Question 13 Discussion

An engineer configures the properties of a cisco UCS cisco integrated Management controller network adapter for a standalone cisco C-Series server. The Fallback Timeout in the vNIC was set to 600. When the failure occurs. The secondary must be used and then fallback when the primary interface becomes available again. Which action be taken to meet these requirements?
D) Enable Uplink failover.
A) Set default VLAN on the adapters.
B) Increase Cos to 6.
C) Disable VNTAG mode.

Cisco 350-601 Exam - Topic 14 Question 13 Discussion

Actual exam question for Cisco's 350-601 exam
Question #: 13
Topic #: 14
[All 350-601 Questions]

An engineer configures the properties of a cisco UCS cisco integrated Management controller network adapter for a standalone cisco C-Series server. The Fallback Timeout in the vNIC was set to 600. When the failure occurs. The secondary must be used and then fallback when the primary interface becomes available again. Which action be taken to meet these requirements?

Show Suggested Answer Hide Answer
Suggested Answer: D

Contribute your Thoughts:

0/2000 characters
Katlyn
10 months ago
Wait, can the primary really come back after 600 seconds? Sounds risky!
upvoted 0 times
...
Arlene
10 months ago
Definitely need to set the right VLANs too.
upvoted 0 times
...
Zoila
11 months ago
Not sure about that, disabling VNTAG could cause issues.
upvoted 0 times
...
Iluminada
11 months ago
I think enabling Uplink failover is the way to go!
upvoted 0 times
...
Junita
11 months ago
Fallback Timeout of 600 is pretty standard.
upvoted 0 times
...
Denny
11 months ago
I think the missing component is Management. That's the option that makes the most sense to me based on the information provided.
upvoted 0 times
...
Tawanna
11 months ago
The Conditional Block is the answer here. That's the group element that controls the execution of individual actions in an Integration Procedure. I'm pretty confident about that.
upvoted 0 times
...
Queenie
11 months ago
This question seems pretty straightforward. I think I can apply the Load Balanced Virtual Server Instances and Elastic Network Capacity patterns to minimize the downtime.
upvoted 0 times
...

Save Cancel