Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Cisco 200-301 Exam - Topic 18 Question 46 Discussion

Posted by Yolando on May 06, 2022 at 06:33 AM

Refer to the exhibit.

An engineer has started to configure replacement switch SW1. To verify part of the configuration, the engineer issued the commands as shown and noticed that the entry for PC2 is missing. Which change must be applied to SW1 so that PC1 and PC2 communicate normally?

A)

B)

C)

D)

Suggested Answer: A

Get Premium 200-301 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
7 comments · newest first
DO
Dorothy 12 months ago
Just add PC2 to the same subnet as PC1!
FI
Filiberto 12 months ago
Wait, are we sure about that? Seems off.
LA
Lauryn 1 year ago
I think Option C is the right choice.
DE
Deandrea 1 year ago
Totally agree, VLAN config is key here!
VE
Veronica 1 year ago
Looks like PC2 isn't in the VLAN.
MA
Maryanne 1 year ago
Okay, I've got this. The key is to use the method that best aligns with Salesforce best practices. I'm pretty sure that means going with the Integration Procedure option.
JE
Jerry 1 year ago
Okay, let's see. Disabling and enabling page locks and lock escalation - that sounds like it could help with the performance issue, but I'm not entirely sure. I'll need to consider the details more carefully.
0/2000 characters

Save Cancel