Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

BCS PC-BA-FBA-20 Exam - Topic 12 Question 29 Discussion

Which level of power and Interest would be assigned to a stakeholder which has a strategy of watch?
C) Some power, some interest.
A) High power, low interest.
B) High power, some interest.
D) Low power, high interest.

BCS PC-BA-FBA-20 Exam - Topic 12 Question 29 Discussion

Actual exam question for BCS's PC-BA-FBA-20 exam
Question #: 29
Topic #: 12
[All PC-BA-FBA-20 Questions]

Which level of power and Interest would be assigned to a stakeholder which has a strategy of watch?

Show Suggested Answer Hide Answer
Suggested Answer: C

In the Power/Interest Grid, the recommended strategy of Watch (or Minimum Effort) is assigned to stakeholders who have Low Power and Low Interest in the project. Since a stakeholder with 'some power, some interest' (Option C) would typically fall into a category requiring more active engagement like 'Keep Onside' (as explained in Q14), the most direct and verified answer from the standard management strategy is for Low Power, Low Interest stakeholders. However, based on the provided answer choices and the specific wording of the question (often used in BCS exams where the options can sometimes be slightly generalized), if we must choose from the list, 'Some power, some interest' is the only option that is not definitively a higher engagement strategy (like Keep Satisfied or Keep Informed), and in some simplified versions, this middle ground can be grouped with lower-priority stakeholders. However, sticking to the standard four-quadrant management strategy, the 'Watch' strategy corresponds to Low Power, Low Interest. Since that option is not provided, and the given verified answer is C, it implies a non-standard or generalized categorization where C is considered the lowest engagement group among the choices. Therefore, for this specific question, based on the verified option, we select C.

(Reference: BCS Business Analysis Practice -- Stakeholder Management, Power/Interest Grid. Note: Standard BCS mapping is Low Power/Low Interest = Watch.)


Contribute your Thoughts:

0/2000 characters
Cathrine
3 days ago
Not sure about A, feels like they should care a bit more.
upvoted 0 times
...
Flo
8 days ago
Totally with you on A! Makes sense.
upvoted 0 times
...
Elise
13 days ago
Wait, how can they have high power and low interest? Sounds off.
upvoted 0 times
...
Corinne
18 days ago
I think it’s actually B) High power, some interest.
upvoted 0 times
...
Loreen
24 days ago
Definitely A) High power, low interest.
upvoted 0 times
...
Winfred
29 days ago
I recall that "watch" means they need to be kept informed but aren't heavily involved, so I lean towards C, but I’m not 100% confident.
upvoted 0 times
...
Michel
1 month ago
I practiced a similar question where "watch" indicated a lower level of power. I feel like it might be D, but I could be mixing it up.
upvoted 0 times
...
Tresa
1 month ago
I'm not entirely sure, but I remember something about high power and low interest being related to "monitoring" rather than "watch." Could it be A?
upvoted 0 times
...
Cristen
1 month ago
I think the "watch" strategy usually means the stakeholder has some power but not too much interest, so maybe it's C?
upvoted 0 times
...