New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

BCS CTFL4 Exam - Topic 6 Question 6 Discussion

Actual exam question for BCS's CTFL4 exam
Question #: 6
Topic #: 6
[All CTFL4 Questions]

Match each objective to the correct test level

Objective:

A) Verifying whether the functional and non-functlonal behaviors of the system are as designed and specified.

B) Verifying whether the functional and non-functlonal behaviors of the interfaces are as designed.

C) Verifying whether the functional and non-functional behaviors of the components are as designed and specified.

D) Establishing confidence in the quality of the system as a whole.

Test Level:

1. Component testing.

2. Integration testing.

3. System testing.

4. Acceptance testing.

Show Suggested Answer Hide Answer
Suggested Answer: C

The test levels and their objectives can be matched as follows:

Verifying whether the functional and non-functional behaviors of the system are as designed and specified (A3: System testing).

Verifying whether the functional and non-functional behaviors of the interfaces are as designed (B2: Integration testing).

Verifying whether the functional and non-functional behaviors of the components are as designed and specified (C1: Component testing).

Establishing confidence in the quality of the system as a whole (D4: Acceptance testing).


Contribute your Thoughts:

0/2000 characters
Kerry
3 months ago
C1 for components? Sounds good to me!
upvoted 0 times
...
Lilli
3 months ago
Wait, are we sure about D being 1? That feels off.
upvoted 0 times
...
Sol
3 months ago
Totally agree with A3, B2!
upvoted 0 times
...
Halina
4 months ago
I think A should be 2, not 3.
upvoted 0 times
...
Kristel
4 months ago
A3, B2, C1, D4 seems right.
upvoted 0 times
...
Belen
4 months ago
D seems like it should be Acceptance testing because it’s about the overall quality, but I’m not completely confident in that choice.
upvoted 0 times
...
Velda
4 months ago
I feel like C should be Component testing since it talks about components specifically, but I could see it being System testing too.
upvoted 0 times
...
Erasmo
4 months ago
For B, I remember it relates to Integration testing because it focuses on how interfaces work together, but I might be mixing it up with Component testing.
upvoted 0 times
...
Renay
5 months ago
I think A matches with System testing since it covers the whole system's behavior, but I'm not entirely sure about the others.
upvoted 0 times
...
Bobbye
5 months ago
This is straightforward, I think. I'll just go through each objective and select the test level that seems most appropriate.
upvoted 0 times
...
Starr
5 months ago
I've got a strategy for this - I'll start by matching the objectives to the test levels that seem like the best fit, then double-check my work to make sure I haven't missed anything.
upvoted 0 times
...
Nikita
5 months ago
Hmm, I'm a bit confused on how to pair these up. I'll need to review the definitions of each test level to make sure I'm understanding them properly.
upvoted 0 times
...
Roslyn
5 months ago
This looks like a tricky one. I'll need to carefully read through the objectives and test levels to make sure I match them up correctly.
upvoted 0 times
...
Man
5 months ago
Okay, I think I've got a handle on this. Let me just double-check my work before submitting.
upvoted 0 times
...
Mose
5 months ago
Hmm, this is a tricky one. I'm not totally sure, but I think the answer might be B - when litigation has started. That seems to be the most common trigger for the duty to preserve evidence.
upvoted 0 times
...
Florinda
5 months ago
I'm a bit unsure about this one. I know parenteral means bypassing the gastrointestinal tract, but I'm not 100% confident on which of these specific routes would be considered non-parenteral. I'll have to make an educated guess.
upvoted 0 times
...
Jeff
2 years ago
Ah, the age-old question: which test level goes with which objective? I'm going to go with B, just because it sounds the most interesting. And hey, if I'm wrong, at least I'll have a good story to tell later!
upvoted 0 times
Maryann
1 year ago
I'm going with A2, B3, C1, D4. Let's see who's right!
upvoted 0 times
...
Carline
1 year ago
I disagree, I believe it's A3, B2, C1, D4.
upvoted 0 times
...
Gertude
1 year ago
I think the correct match is A3, B2, C4, D1.
upvoted 0 times
...
Zena
1 year ago
I'm going with A2, B3, C1, D4.
upvoted 0 times
...
Jose
2 years ago
I believe it's A3, B2, C1, D4.
upvoted 0 times
...
Lashawnda
2 years ago
I think the correct match is A3, B2, C4, D1.
upvoted 0 times
...
...
Harrison
2 years ago
I'm not sure, but I think it might be A3, B2, C1, D4.
upvoted 0 times
...
Wayne
2 years ago
I disagree, I believe it should be A2, B3, C1, D4.
upvoted 0 times
...
Kara
2 years ago
Alright, let's do this! Objective A is system testing, Objective B is integration testing, Objective C is component testing, and Objective D is acceptance testing. Easy peasy, right? Or is it just me?
upvoted 0 times
Jose
2 years ago
That's correct! A is system testing, B is integration testing, C is component testing, and D is acceptance testing.
upvoted 0 times
...
Coral
2 years ago
I think you got it right! A3, B2, C1, D4
upvoted 0 times
...
...
Lauran
2 years ago
I think the correct match is A3, B2, C4, D1.
upvoted 0 times
...
Candra
2 years ago
This is tricky. I think Objective A is system testing, Objective B is integration testing, Objective C is component testing, and Objective D is acceptance testing. But I'm not a mind reader, so who knows?
upvoted 0 times
Yong
2 years ago
No problem! It can be tricky to match objectives to test levels sometimes.
upvoted 0 times
...
Annamae
2 years ago
Oh, I see. Thanks for clarifying!
upvoted 0 times
...
Nan
2 years ago
That's close! But the correct match is A3, B2, C4, D1.
upvoted 0 times
...
Adaline
2 years ago
I think Objective A is system testing, Objective B is integration testing, Objective C is component testing, and Objective D is acceptance testing.
upvoted 0 times
...
...
Hannah
2 years ago
Hmm, let's see. Objective A definitely sounds like system testing, and Objective B seems to be integration testing. But I'm not sure about C and D. Maybe I'll just guess and hope for the best!
upvoted 0 times
Roselle
2 years ago
I agree with you on Objective C, but I think Objective D is actually system testing.
upvoted 0 times
...
Lashanda
2 years ago
I think Objective C is component testing and Objective D is acceptance testing.
upvoted 0 times
...
...

Save Cancel