Materials that are accepted through a material review process even if they are out of specification are considered
A) conditionally accepted
B) floor failure events
C) control of acceptance
D) raw accepted

ASQ CMQ-OE Exam - Topic 2 Question 105 Discussion

Actual exam question for ASQ's CMQ-OE exam
Question #: 105
Topic #: 2
[All CMQ-OE Questions]

Materials that are accepted through a material review process even if they are out of specification are considered

Show Suggested Answer Hide Answer
Suggested Answer: A

Contribute your Thoughts:

0/2000 characters
I keep mixing up the terms, but I think "conditionally accepted" makes the most sense based on the material review process we studied.
upvoted 0 times
...
Fausto
5 days ago
I feel like "raw accepted" was mentioned in the context of materials, but I don't think that's the right answer here.
upvoted 0 times
...
Evangelina
10 days ago
I remember discussing something similar in class, but I can't recall if it was about "floor failure events" or "control of acceptance."
upvoted 0 times
...
Nickie
15 days ago
I think the term we're looking for is "conditionally accepted," but I'm not entirely sure. It sounds familiar from our last review session.
upvoted 0 times
...

Save Cancel