API-936 Exam - Topic 4 Question 17 Discussion

Posted by Thora on Apr 13, 2026 at 03:06 AM

[Material Requirements]

In the absence of owner specification, which party or individual sets the temperature limits for refractory and mix water?

Suggested Answer: B

Get Premium API-936 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
20 comments · newest first
TA
Tambra 3 months ago
Contractor makes sense too. They have practical experience on-site.
AL
Almeta 3 months ago
I feel Manufacturer is the safest choice. They provide guidelines.
LI
Lisha 3 months ago
Independent refractory lab could also be right. They test the materials.
RO
Rosita 3 months ago
What about the Inspector? They ensure compliance with standards.
AD
Adelle 3 months ago
I disagree. The Contractor should set the limits. They manage the project.
CO
Colby 4 months ago
I think it's the Manufacturer. They know their materials best.
SH
Shasta 4 months ago
Independent labs can also play a role, right?
GI
Gilbert 4 months ago
Not sure about that, seems like it should be the inspector's job.
GE
Genevive 4 months ago
Wait, I thought the contractor had a say in that too?
CH
Cherry 4 months ago
Definitely agree, the manufacturer knows their product best!
CO
Corrinne 4 months ago
I think it's usually the manufacturer who sets those limits.
WI
Wilda 5 months ago
I thought inspectors had a say in this too.
CA
Catalina 5 months ago
I agree with Candida, manufacturers have the specs.
CI
Ciara 5 months ago
Wait, is it really the manufacturer? That seems off.
YV
Yvette 6 months ago
Definitely the contractor! They know the project best.
CA
Candida 7 months ago
I think it's usually the manufacturer who sets those limits.
SH
Shantell 7 months ago
I thought an independent refractory lab would set those limits, but I’m not confident about that.
SH
Sherron 7 months ago
I feel like the inspector might have some input, but I can't recall if they have the final say on temperature limits.
TE
Terry 7 months ago
I remember a practice question where the manufacturer was responsible for the mix water temperature. Could it be the same here?
AL
Alisha 8 months ago
I think the contractor usually has a say in setting those limits, but I'm not entirely sure.
0/2000 characters

Save Cancel