API-580 Exam - Topic 1 Question 14 Discussion

Posted by An on May 09, 2022 at 02:22 PM

If the probability and consequence combination (risk) is high enough to be unacceptable, then

Suggested Answer: A

Get Premium API-580 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
9 comments · newest first
FR
Francoise 11 months ago
High probability + high consequence = action needed, so A is the way to go.
SH
Shasta 11 months ago
Wait, are we really saying we shouldn't mitigate high risks? That seems off!
AL
Alex 12 months ago
C makes sense, analyzing risks is crucial before deciding.
MI
Minna 12 months ago
I think B could be valid too, sometimes you can't predict everything.
NA
Naomi 12 months ago
Definitely A, we need to prevent those high risks!
JU
Julio 1 year ago
Hmm, let me think about this. Fluid retention, headache, and hypertension all seem like common side effects of oral contraceptives. Constipation and depression are a bit trickier, but I'll have to carefully consider each option.
LI
Lino 1 year ago
I remember we talked about templates in class, and I think one editable template could work since all pages have a similar design.
AL
Aleisha 1 year ago
This is a tricky one. On the one hand, the program office providing support could make sense, but on the other hand, the project manager should really be responsible for their own project support. I'm a bit torn between options A and C. I'll need to weigh the pros and cons carefully.
JA
Janessa 1 year ago
I'm not entirely sure about this one. Is it something to do with the DHCP snooping database? I'll need to think it through carefully and review the material before answering.
0/2000 characters

Save Cancel