New Year Sale 2026! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

AHIMA RHIA Exam - Topic 8 Question 62 Discussion

Actual exam question for AHIMA's RHIA exam
Question #: 62
Topic #: 8
[All RHIA Questions]

Sally had three babies in 4 years and she considered that more than enough. During her hospitalization for her third delivery, Sally had a sterilization procedure performed. When the record is coded, the V-code for sterilization, V25.2 is

Show Suggested Answer Hide Answer
Suggested Answer: C

Contribute your Thoughts:

0/2000 characters
Jarvis
4 months ago
Totally agree, secondary diagnosis makes sense!
upvoted 0 times
...
Rosalia
4 months ago
Are we sure V25.2 is even relevant here?
upvoted 0 times
...
Reed
4 months ago
Wow, three babies in four years is a lot!
upvoted 0 times
...
Solange
4 months ago
I thought it was the principal diagnosis?
upvoted 0 times
...
Daron
4 months ago
V25.2 is definitely a secondary diagnosis.
upvoted 0 times
...
Ryan
5 months ago
I vaguely remember that V-codes are usually secondary, but I’m not confident about how they relate to the principal diagnosis in this scenario.
upvoted 0 times
...
Iesha
5 months ago
I feel like V25.2 is important, but I can't recall if it should be the only code used. That seems a bit off.
upvoted 0 times
...
Quentin
5 months ago
I think we practiced a similar question where a procedure was coded as a secondary diagnosis. Maybe that's the case here too?
upvoted 0 times
...
Pamella
5 months ago
I remember discussing V-codes in class, but I'm not sure if they should be the principal diagnosis or not.
upvoted 0 times
...
Leila
5 months ago
I'm a bit confused by the options here. I'll need to review my notes on tunneling protocols to make sure I select the right ones.
upvoted 0 times
...
Hester
5 months ago
Hmm, I'm a bit unsure about this one. The options seem quite similar, and I'm not sure which one would best meet the requirements. I'll need to think it through carefully.
upvoted 0 times
...
Sheridan
5 months ago
Hmm, I'm a bit unsure about this one. I know variable costs change with the level of output, but I'm not sure which of these specific items would be considered variable.
upvoted 0 times
...
Kristian
5 months ago
The rework cost being 50% of total costs is a pretty significant problem, but I'm not sure if that's the least motivating factor. I'll need to think carefully about how each option would impact management's decision-making.
upvoted 0 times
...

Save Cancel