Deal of The Day! Hurry Up, Grab the Special Discount - Save 25% - Ends In 00:00:00 Coupon code: SAVE25
Welcome to Pass4Success

- Free Preparation Discussions

Adobe AD0-E722 Exam - Topic 2 Question 55 Discussion

Posted by Mammie on May 13, 2026 at 03:14 AM

An Adobe Commerce Architect needs to ensure zero downtime during the deployment process of Adobe Commerce on-premises. Which two steps should the Architect follow? (Choose two.)

Suggested Answer: A, C

Option A is correct because enabling the config flag under deployment/blue_green/enabled is one of the steps to ensure zero downtime during the deployment process of Magento 2 on-premises. This flag enables the blue-green deployment feature, which allows deploying a new version of the Magento application to a separate environment (blue) without affecting the current live environment (green).Once the new version is ready, the traffic can be switched from green to blue with minimal or no downtime1.

Option C is correct because running bin/magento setup:upgrade --keep-generated is another step to ensure zero downtime during the deployment process of Magento 2 on-premises. This command updates the database schema and data without deleting the generated code and static view files.This way, the Magento application can still serve requests from the cache while the database is being upgraded2.

Option B is incorrect because running bin/magento setup:upgrade --dry-run=true does not upgrade the database, but only checks if there are any errors or conflicts in the database schema or data.This command can be used for testing purposes, but it does not affect the deployment process or the downtime3.

Option D is incorrect because there is no such option as --convert-old-scripts-true for the bin/magento setup:upgrade command. This option does not exist in Magento 2 and does not have any effect on the deployment process or the downtime.

Option E is incorrect because there is no such config flag as developer/zero_down_time/enabled in Magento 2. This flag does not exist in Magento 2 and does not have any effect on the deployment process or the downtime.


1: Blue-green deployment | Adobe Commerce Developer Guide

2: Deploy Magento to production | Adobe Commerce Developer Guide

3: Command-line installation options | Adobe Commerce Developer Guide

Get Premium AD0-E722 Questions as Interactive Web-Based Practice Test or PDF Real Exam Format Detailed Explanations Instant Access Get Your Practice Test
22 comments · newest first
AM
Ammie 3 days ago
I agree, A is essential for blue-green deployment.
AR
Aron 8 days ago
I think A and E are the best choices. Zero downtime is crucial.
CL
Clay 13 days ago
A and E cover the deployment strategy well. Good choices!
GI
Giovanna 18 days ago
I feel like E is essential for ensuring no interruptions.
TI
Timothy 23 days ago
B is useful, but it doesn’t guarantee zero downtime like A and E.
PH
Phuong 29 days ago
What about B? Isn’t it important to check the upgrade first?
LE
Lenna 1 month ago
I agree, A is definitely needed for blue-green deployment.
DW
Dwight 1 month ago
I think A and E are the best options. Zero downtime is crucial.
CH
Charlesetta 1 month ago
I disagree, I always use C for upgrades.
AR
Arlette 2 months ago
Definitely A and E, no doubt about it!
TI
Tijuana 2 months ago
Wait, is there really a config flag for zero downtime? Sounds too good to be true!
LO
Lourdes 2 months ago
I think B is also important for the upgrade process.
CE
Celeste 2 months ago
A and E are the right steps for zero downtime.
DO
Donette 2 months ago
I thought zero downtime was impossible with upgrades!
EL
Elouise 3 months ago
Totally agree with A and E! Can't risk downtime.
CO
Colby 3 months ago
Wait, is D even a real command? Sounds off.
CA
Catherin 3 months ago
I think B is also important for a smooth upgrade.
PE
Pearlie 3 months ago
A and E are the right steps for zero downtime.
AN
Anjelica 3 months ago
I feel like I’ve seen both A and E mentioned in the context of zero downtime, but I can’t recall which one is the correct choice.
NA
Nakisha 3 months ago
I’m a bit confused about the dry run command. Is it really necessary to run that before the actual upgrade?
VI
Vivan 4 months ago
I remember practicing a similar question where we had to choose steps for a smooth deployment. I think option C sounds familiar for upgrading the database.
DA
Darrel 5 months ago
I think enabling the config flag for zero downtime is definitely important, but I’m not sure if it’s option A or E.
0/2000 characters

Save Cancel